All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Assembly Line Tracking
  2. Production review and reporting
Reference

Reports for the questions your team asks

Read station activity, production output and stock movements at their recorded level of detail.

Overview
Assembly Line Tracking · Overview

Assembly Line Tracking dashboard

This quarter

Orders in view
6
Draft
6

Work orders by status

How far records got this quarter

StageReachedStep
Draft34
Released2368%
In progress1357%
Quality review754%

Planned quantity by status

Sample totals per stage

10.0k0
10.0kDraft
6.0kReleased
4.0kIn progress
3.0kQuality review
7.0kCompleted
Example screen with sample data

Questions to answer

Work Order Progress List

Which production work is still Draft, already Released or waiting for the quality decision?

Takt Targets by Product Grouped

What station order and target pace has the planner set for the product?

Station Passage Durations List

How long did the recorded serial remain at a station between entry and exit?

Station Disposition Summary List

Where are Pass, Rework and Reject outcomes appearing in station capture?

Good and Scrap Output Grouped

What output did each operator report against the work order?

Material Posting Activity List

Which issues consumed stock and which were reversed?

Purchasing Receipts Grouped

How do received item quantities compare with the supplier quantities ordered?

Reading the results

Read station duration in the context of how the floor records entry and exit. Waiting at a bench can affect that interval, so discuss unusual durations with Production Operator before changing a target. Station passes describe serial activity; production intervals describe work-order output and operator timing. Keep those levels of detail clear when reviewing a run.

For the stock discussion, distinguish Posted issues from Reversed ones and Pending batches from Released output. Production Planner reconciles finished balances after Quality Reviewer accepts the batch. A useful review can trace an unexpected total back to its item, lot or work order.

More reports

Planned Work by Station Grouped

List work orders under Resource with planned start, planned end and planned quantity beside the resource’s declared capacity minutes per day.

Output Awaiting Release Grouped

List Batches by work order with lot number, produced at and Disposition for the quality review discussion.

Set up Assembly Line Tracking your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appAssembly Line Tracking

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.