Where it usually breaks
And how to keep it from happening.
- A required customer date is copied into the production plan without checking the assigned resource. Review the actual planned window with Operator before release.
- A draft survives after the customer order changes. The release check must examine the current order lifecycle.
- A quantity request arrives after release. Planner must inspect the frozen basis and agree the next action before the floor changes its production target.