Process · Engineering change review

Engineering change review

Submit a complete request, obtain the named engineering decision and verify what was actually implemented.

Step by step

  1. Describe the request Production Planner

    Production Planner identifies the revision and records a reason on the change request. The planner selects the requester and approver from the people records and enters the request date. The request should explain the component or dated structure the deciding person needs to inspect.

    • Capture reason and named people
    • Updates BOM change requests, People, BOM revisions
  2. Submit for review Production Planner

    Production Planner runs the change guard. Resolved revision, requester and approver references and a recorded reason permit Draft to Review once. An approver value identifies the intended reviewer; it does not record approval by itself.

    • Draft to Review once
    • Updates BOM change requests
  3. Decide the change Manager

    Manager, acting as the designated approver, reviews the request against BOM revisions and component lines and approves or rejects it. Use the decision actions configured during setup to record Approved or Rejected after the actual review. Keep the submitted request distinct from its later application.

    • Approved or Rejected decision
    • Updates BOM change requests, BOM revisions, BOM components
    ApprovalA person approves before the work moves on.
  4. Apply the agreed structure Production Planner

    Production Planner prepares the accepted changes on an editable revision, with Manager's separate engineering release decision before use. Keep an existing Released structure intact. A work order already underway needs its own instruction review so the operator receives the correct instructions.

    • Prepare replacement and check affected instructions
    • Updates BOM revisions, BOM components, Work orders
  5. Confirm implementation Production Planner

    Production Planner checks the actual resulting structure and moves the request from Approved to Implemented. A decision without application remains Approved. Keep the resulting structure available for the reviewer and planner to inspect.

    • Approved to Implemented update
    • Updates BOM change requests, BOM revisions

Where it usually breaks

And how to keep it from happening.

  • The approver is named on the request, but nobody has made the decision.
  • An incomplete reason passes through a manual status edit instead of the submission guard.
  • Implemented is chosen before the replacement structure and production handoff are checked.
Production Planner
, Manager, Admin.