1. Campus Facility Management
  2. Data model
Reference

The tables behind Campus Facility Management

Campus Facility Management ships with 11 tables, grouped here by the feature that uses them. Every record your team works with lives in one of them, and you can add fields and tables in Proto.

Tables
11
Features
6, plus shared settings
Change it
Add fields and tables in Proto

How the model is organised

Equipment

Assets holds identity, location and service state; building meters and preventive maintenance plans each link to the maintained asset.

Work

Work orders links the asset to an assignee in People. Work logs records technician activity; safety permits records authorization for the order.

Material and history

Part usage connects a work order to spare parts. Service history connects completed work back to the asset and order.

People

People links staff entries to Users and supports assignee, issuer and technician references.

Every table, by feature

Assets

5 tablesAbout this feature
  • Assets

    Campus asset registry

  • Work orders

    Maintenance work orders through their lifecycle

    Linked to Assets, People
  • Building meters

    Building meter readings per asset: measurement point, value, unit and action limit.

    Linked to Assets
  • Preventive maintenance plans

    Preventive maintenance intervals per asset: last completion and next due date.

    Linked to Assets
  • Service history

    Completed maintenance history per asset

    Linked to Assets, Work orders

Work orders

7 tablesAbout this feature
  • Work orders

    Maintenance work orders through their lifecycle

    Linked to Assets, People
  • Assets

    Campus asset registry

  • People

    Maintenance staff directory

    Linked to Users
  • Safety permits

    Safety permits authorizing work

    Linked to People, Work orders
  • Work logs

    Technician work performed against a work order

    Linked to People, Work orders
  • Service history

    Completed maintenance history per asset

    Linked to Assets, Work orders
  • Part usage

    Parts consumed on work orders

    Linked to Spare parts, Work orders

Safety permits

4 tablesAbout this feature
  • Safety permits

    Safety permits authorizing work

    Linked to People, Work orders
  • Work orders

    Maintenance work orders through their lifecycle

    Linked to Assets, People
  • People

    Maintenance staff directory

    Linked to Users
  • Assets

    Campus asset registry

Preventive maintenance

5 tablesAbout this feature
  • Preventive maintenance plans

    Preventive maintenance intervals per asset: last completion and next due date.

    Linked to Assets
  • Assets

    Campus asset registry

  • Work orders

    Maintenance work orders through their lifecycle

    Linked to Assets, People
  • Safety permits

    Safety permits authorizing work

    Linked to People, Work orders
  • Service history

    Completed maintenance history per asset

    Linked to Assets, Work orders

Building meters

4 tablesAbout this feature
  • Building meters

    Building meter readings per asset: measurement point, value, unit and action limit.

    Linked to Assets
  • Assets

    Campus asset registry

  • Work orders

    Maintenance work orders through their lifecycle

    Linked to Assets, People
  • Service history

    Completed maintenance history per asset

    Linked to Assets, Work orders

Parts and service

5 tablesAbout this feature
  • Spare parts

    Spare part inventory catalog

  • Part usage

    Parts consumed on work orders

    Linked to Spare parts, Work orders
  • Work orders

    Maintenance work orders through their lifecycle

    Linked to Assets, People
  • Assets

    Campus asset registry

  • Service history

    Completed maintenance history per asset

    Linked to Assets, Work orders

Shared and settings

1 table
  • Users

    Users

    Linked to Users

Keys and references

Use asset tags and serial numbers to confirm the physical equipment, but preserve the record references for work and history. A permit’s work order must identify the exact job it authorizes. The work log’s Technician and the order’s assigned to both refer to People. Part usage needs both its Part and work order references. Service history retains both Asset and work order links.

Migration order

  1. Load Users and People, then confirm the names used for assignments and permit issue.
  2. Load Assets and spare parts with verified physical identity and stock units.
  3. Add preventive maintenance plans and building meters to the correct assets.
  4. Bring in open work orders and their safety permits, then work logs and part usage where applicable.
  5. Reconcile service history against the asset and completed order before daily use.

Set up Campus Facility Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started