Feature · Changes and deployments

Changes and deployments

Review a planned cost change, record the decision and check its outcome.

OverviewChanges In Review
Cloud Cost Management · Changes and deployments

Changes In Review

Approval conditions

New
IdSummaryRiskStatusScheduled startScheduled end
IDD-307SMM-982LowReview26 Oct28 Oct
IDD-427SMM-296MediumReview27 Oct31 Oct
IDD-934SMM-111HighReview15 Oct17 Oct
IDD-778SMM-890LowReview25 Oct01 Nov
IDD-773SMM-548MediumReview26 Oct30 Oct
6 of 6 records
IDD-307Changes · CHN-82853
Low
SummarySMM-982
StatusReview
Scheduled start26 Oct
Scheduled end28 Oct
ServiceSRV-1651
Example screen with sample data

What you can do

Give the reviewer a complete plan

A proposed change records its summary, risk, scheduled start and end, service and rollback plan. The reviewer records a separate change approval reviews decision and reason. This keeps the plan apart from the human decision that permits it to proceed. A rejected change stays visible as Rejected; an approved change moves into implementation only when the team is ready.

Optimization deployments records the service, environment, version, application time, status and any reversal reference. Savings reversal checks later compares the expected baseline with actual realized cost. The deployment result and cost result answer different questions. A Succeeded deployment may still fail to produce the expected saving.

How the work is organized

  • Plan. State the service impact, risk, time window and rollback path.
  • Approval. Record who reviewed the change and why it was approved, rejected or deferred.
  • Outcome. Track deployment status and compare the later cost result with the baseline.

What to agree during setup

Name the Change Approver for each service and define which risk level needs a wider review. Agree the evidence required before a reviewer chooses Approve. The team should also decide who can mark a change Verified and how much usage history is enough to judge the saving. Check that a rollback plan is usable by the engineer on duty during the scheduled window.

A rehearsal should include a rejected path as well as an approved path. The reviewer must be able to see why the decision differed and the engineer must be able to tell which change may proceed.

Check the handoff on an actual case

A service owner proposes a capacity reduction after an underuse review. The change describes the resource, risk, start and end, and how to restore capacity if performance falls. The Change Approver reads the plan, records an Approve decision and reason, and the owner marks the change Approved. During the window, Cloud Operations Engineer records a deployment in Applying and then Succeeded after observing the service. Finance Manager compares subsequent charges with the expected baseline. The owner marks the change Verified only when the result is supported; if the service is restored, the deployment and change retain their reversal trail.

What your team sees

  • Changes In Review — Find changes waiting for a decision.
  • Change Schedule — See approved and implementing work by planned window.

Follow the work through

What it keeps track of

Data model
Changes
A planned change to a service, used to schedule and coordinate work with a clear rollback plan.
Change approval reviews
Records a reviewer's decision on a proposed change, so approvals and reasons are kept on file.
Optimization deployments
Records a cost-saving change applied to a service, so the team can track rollouts and reversals.
Savings reversal checks
Compares expected versus actual cost after a change, catching savings that got reversed unexpectedly.
Services
Represents an IT service the team supports, tracked for criticality, status, and ownership.

Who uses it

Permissions
Service Owner
, Change Approver, Cloud Operations Engineer, Finance Manager.