Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Industrial Automation CPQ
- Downstream order system
- Product pricing source
- Exchange-rate source
- Engineering and customer evidence
CPQ for Industrial Automation runs the commercial work around controller and automation options: establish the customer and organization, check protocol and IO requirements, price quote lines, obtain independent review and record customer acceptance. The compatibility request holds the controller model, protocol, IO points and required date beside the parent quote.
submission waits for the quote specialist
| Record number | Subject | Counterparty | Price book revision | Revision | Net amount USD | |
|---|---|---|---|---|---|---|
| QTS-47921 | Eastbank packaging line controls | Eastbank Packaging Works | Controls catalog 2026.1 | 400 | 20 | |
| QTS-82346 | Harborline pump station upgrade | Westport Metal Forming | Drive schedule 2026.2 | 650 | 810 | |
| QTS-11375 | Cedar Vale conveyor integration | Eastbank Packaging Works | Integration rates 2026.3 | 770 | 140 | |
| QTS-65081 | Northmere tank farm monitoring | Willowcrest Water Services | Panel pricing 2026.4 | 210 | 300 | |
| QTS-42789 | Ridgeway bottling line retrofit | Northmere Process Group | Autumn catalog 2026.5 | 660 | 850 |
Pricing Reviewer independently approves or rejects the submitted controller compatibility revision.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep each automation quote with an eligible customer, operating organization and accountable owner.
Customers
| Name | Code | Contact name | Address | Eligibility note | Organization | |
|---|---|---|---|---|---|---|
| Eastbank Packaging Works | AUT-CUST-1042 | Amira Voss | 210 Eastbank Road, plant 2 | Engineering scope approved | Eastbank Control Partners | |
| Harborline Fluid Systems | AUT-CUST-1088 | Leo Serrano | 84 Harbor Lane, pump house | Credit account current | Eastbank Control Partners | |
| Cedar Vale Materials | AUT-CUST-1125 | Priya Okoro | 17 Cedar Avenue, bay 4 | Site survey completed | Ridgeway Instrumentation | |
| Northmere Process Group | AUT-CUST-1171 | Owen Calder | 900 Northmere Way, tank yard | Safety review received | Ridgeway Instrumentation | |
| Ridgeway Beverage Works | AUT-CUST-1214 | Nadia Park | 41 Ridgeway Road, line 3 | Integration window reserved | Silverway Automation Group |
Review protocol, IO points and controller choice against an exact compatibility revision before committing option prices.
Approval conditions
| Parent | Protocol | IO points | Controller model | Required by | Revision | |
|---|---|---|---|---|---|---|
| Cedar Vale conveyor integration | Modbus TCP | 670 | CX-240 modular controller | 26 Nov | 170 | |
| Silverfen palletizer controls | PROFINET | 60 | AX-18 compact controller | 23 Nov | 420 | |
| Harborline pump station upgrade | Ethernet/IP | 380 | PX-800 process controller | 17 Nov | 270 | |
| Silverfen palletizer controls | OPC UA | 640 | MX-32 motion controller | 12 Nov | 150 | |
| Westport press cell safety upgrade | Building automation IP | 450 | SX-400 safety controller | 10 Nov | 460 |
Price validated draft lines against a known revision and bring the resulting quote value to independent review.
Quotes
| Record number | Subject | Counterparty | Owner | Revision | Net amount USD | |
|---|---|---|---|---|---|---|
| QTS-52184 | Eastbank packaging line controls | Harborline Fluid Systems | Omar Petrov | 270 | 180 | |
| QTS-77944 | Harborline pump station upgrade | Willowcrest Water Services | Nina Brooks | 670 | 790 | |
| QTS-66802 | Cedar Vale conveyor integration | Silverfen Distribution Plant | Ayla Haddad | 560 | 810 | |
| QTS-89456 | Northmere tank farm monitoring | Willowcrest Water Services | Sofia Chen | 200 | 670 | |
| QTS-58067 | Ridgeway bottling line retrofit | Northmere Process Group | Ayla Haddad | 680 | 110 |
Keep approval, return, rejection and customer acceptance tied to the quote revision being decided.
Quotes
| Record number | Counterparty | Revision | Accepted at | Net amount USD | Owner | |
|---|---|---|---|---|---|---|
| QTS-74851 | Silverfen Distribution Plant | 840 | 27 Nov | 900 | Marcus Ibarra | |
| QTS-54813 | Harborline Fluid Systems | 350 | 18 Nov | 270 | Sofia Chen | |
| QTS-52227 | Cedar Vale Materials | 200 | 29 Nov | 660 | Daniel Voss | |
| QTS-10942 | Silverfen Distribution Plant | 290 | 14 Nov | 610 | Sofia Chen | |
| QTS-81622 | Harborline Fluid Systems | 110 | 17 Nov | 720 | Nina Brooks |
Hand an accepted quote to the configured order connection and retain the actual result for follow-up.
Quotes
| Record number | Subject | Counterparty | Status | Valid until | Revision | |
|---|---|---|---|---|---|---|
| QTS-52004 | Eastbank packaging line controls | Eastbank Packaging Works | Draft | 16 Nov | 280 | |
| QTS-35970 | Harborline pump station upgrade | Silverfen Distribution Plant | Review | 20 Nov | 810 | |
| QTS-58315 | Cedar Vale conveyor integration | Cedar Vale Materials | Approved | 05 Nov | 530 | |
| QTS-80854 | Northmere tank farm monitoring | Eastbank Packaging Works | Accepted | 24 Nov | 690 | |
| QTS-39872 | Ridgeway bottling line retrofit | Ridgeway Beverage Works | Expired | 21 Nov | 210 |
Keep quote evidence with its decisions and resolve corrections or uncertain operation outcomes without discarding history.
Operation receipts
| Parent | Operation key | Action | Expected revision | Result state | Occurred at | |
|---|---|---|---|---|---|---|
| Westport press cell safety upgrade | price-eastbank-controls | Validate node compatibility | 430 | Pending | 18 Nov | |
| Silverfen palletizer controls | review-harbor-pumps-v2 | Price control package | 930 | Failed | 24 Nov | |
| Eastbank packaging line controls | accept-cedar-conveyor | Check I/O capacity | 380 | Needs review | 15 Nov | |
| Eastbank packaging line controls | price-northmere-tank | Submit quote for review | 100 | Pending | 11 Nov | |
| Ridgeway bottling line retrofit | handoff-ridgeway-line | Record customer acceptance | 900 | Failed | 16 Nov |
Automation quote to handoff ships ready to use. 2 steps need a named approval before the work moves on: Compatibility Review (Pricing Reviewer) and Quote Approval (Pricing Reviewer).
Review protocol, IO requirements and controller choice before committing the option price.
Validate draft lines and calculate the commercial amount for review.
Independently decide the priced offer and retain the reason against its revision.
Record the customer's acceptance of the approved offer while it remains valid.
Send accepted scope through the configured order connection and retain the actual outcome.
Compare uncertain operation claims with evidence and assign discrepancies for follow-up.
Open any quote to see its automation nodes, the roles that work on it, its process stages and its approvals on one page.
Counterparty, Price book revision, Revision and Net amount USD.
Each line is linked to this quote.
Quote Specialist, Pricing Reviewer and Auditor, each with their own permissions.
Prepare Quote and Submit Compatibility, with the role that acts.
Compatibility Review and Quote Approval, with who decides.
Eastbank Packaging Works
| Parent | Protocol | IO points |
|---|---|---|
| Cedar Vale conveyor integration | Modbus TCP | 670 |
| Silverfen palletizer controls | PROFINET | 60 |
| Harborline pump station upgrade | Ethernet/IP | 380 |
Pricing Reviewer reads the scoped records and decides through the review actions. Reviewer independence and expected revision matter at the point of decision.
Signed in as Pricing Reviewer
| Decision | Approver | |
|---|---|---|
| Compatibility ReviewReview protocol, IO requirements and controller choice before committing the option price. | Pricing Reviewer | |
| Quote ApprovalIndependently decide the priced offer and retain the reason against its revision. | Pricing Reviewer |
Everyone opens Industrial Automation CPQ to the work that is theirs. Pick a role to see what it starts with.
Prepare assigned draft quotes and attachments; guarded workflows own protected transitions.
This is the first screen this role sees.
Quotes · Quote Specialist
| Record number | Subject | Counterparty | Price book revision | Revision | Net amount USD | |
|---|---|---|---|---|---|---|
| QTS-47921 | Eastbank packaging line controls | Eastbank Packaging Works | Controls catalog 2026.1 | 400 | 20 | |
| QTS-82346 | Harborline pump station upgrade | Westport Metal Forming | Drive schedule 2026.2 | 650 | 810 | |
| QTS-11375 | Cedar Vale conveyor integration | Eastbank Packaging Works | Integration rates 2026.3 | 770 | 140 | |
| QTS-65081 | Northmere tank farm monitoring | Willowcrest Water Services | Panel pricing 2026.4 | 210 | 300 | |
| QTS-42789 | Ridgeway bottling line retrofit | Northmere Process Group | Autumn catalog 2026.5 | 660 | 850 |
Independently review eligible revisions and reconcile evidence through guarded actions.
This is the first screen this role sees.
Automation nodes · Pricing Reviewer
| Parent | Protocol | IO points | Controller model | Required by | Revision | |
|---|---|---|---|---|---|---|
| Cedar Vale conveyor integration | Modbus TCP | 670 | CX-240 modular controller | 26 Nov | 170 | |
| Silverfen palletizer controls | PROFINET | 60 | AX-18 compact controller | 23 Nov | 420 | |
| Harborline pump station upgrade | Ethernet/IP | 380 | PX-800 process controller | 17 Nov | 270 | |
| Silverfen palletizer controls | OPC UA | 640 | MX-32 motion controller | 12 Nov | 150 | |
| Westport press cell safety upgrade | Building automation IP | 450 | SX-400 safety controller | 10 Nov | 460 |
Read scoped evidence and reports only.
This is the first screen this role sees.
Quotes · Auditor
Maintain organizations, memberships and customers without operational approval authority.
This is the first screen this role sees.
Customers · App Administrator
| Name | Code | Contact name | Address | Eligibility note | Organization | |
|---|---|---|---|---|---|---|
| Eastbank Packaging Works | AUT-CUST-1042 | Amira Voss | 210 Eastbank Road, plant 2 | Engineering scope approved | Eastbank Control Partners | |
| Harborline Fluid Systems | AUT-CUST-1088 | Leo Serrano | 84 Harbor Lane, pump house | Credit account current | Eastbank Control Partners | |
| Cedar Vale Materials | AUT-CUST-1125 | Priya Okoro | 17 Cedar Avenue, bay 4 | Site survey completed | Ridgeway Instrumentation | |
| Northmere Process Group | AUT-CUST-1171 | Owen Calder | 900 Northmere Way, tank yard | Safety review received | Ridgeway Instrumentation | |
| Ridgeway Beverage Works | AUT-CUST-1214 | Nadia Park | 41 Ridgeway Road, line 3 | Integration window reserved | Silverway Automation Group |
Maintain platform user access under the agreed setup policy, without automatic pricing or compatibility approval authority.
Review quote value, compatibility demand and unresolved operation evidence in their lifecycle context.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 31 | ||
| Review | 15 | 48% | |
| Approved | 10 | 67% | |
| Accepted | 7 | 70% |
Sample totals per stage
Which commercial amounts belong to Draft, Review, Approved or Accepted offers in each operating organization?
Which protocol and controller requests still need a decision, and when is that decision required?
Show each quote's line quantities, USD unit prices, line discounts, unit costs and net line amounts for commercial review.
Who decided the submitted offer, what was their reason and which source revision did they inspect?
List quote validity dates with status, owner and net amount in USD so the team can assess expired validity in context.
Which actions remain pending, have failed or need review, and what evidence or connection investigation is needed?
List customer active settings and eligibility notes by organization, with account codes and contact names for quote preparation.
Which files support the offer, who uploaded them and which are marked Shared?
See how Industrial Automation CPQ fits your kind of team.
Keep controller compatibility and commercial quote decisions connected for customer automation projects.
Prepare repeatable controller and IO equipment offers with explicit price inputs and independent commercial review.
Quote controller upgrades with a reviewed technical scope and a traceable customer commitment.
Each stage of automation quote to handoff names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to help prepare automation offers and inspect quote evidence within the team's access and decision rules.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 11 tablesStart with one team and one process, then add the rest once the basics are running.
App Administrator maintains the operating organization, eligible customers and active team membership. Admin prepares user access. Rehearse the specialist’s personal work and the reviewer’s independent access.
Choose a controller request with protocol, IO points and a required date. Decide what evidence Pricing Reviewer needs and rehearse submission, approval, rejection and completion.
Quote Specialist prepares commercial lines with the price book revision and validity date. Calculate expected net amounts separately and compare the pricing result. Test an invalid line and an old revision.
Pricing Reviewer decides the current priced revision. Test Return and Reject alongside Approve. Quote Specialist records valid customer acceptance and rehearses an expired acceptance attempt.
Agree the downstream destination and returned reference. Test a missing connection, repeated handoff and conflicting receipt evidence. Rehearse reviewer-authorized compensation for accepted scope before live use.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure CPQ for Industrial Automation for your business. Pilot a controller quote with an eligible customer, a compatibility request, priced lines and an independent reviewer. Include customer acceptance and a rehearsal of the intended order connection.
Record the required protocol, IO points, proposed controller model and required date on the compatibility request. Link it to the quote and operating organization, then attach the evidence Pricing Reviewer needs to judge the request.
Pricing Reviewer decides the submitted compatibility revision independently. Quote Specialist prepares and submits the request. Complete the Approved request through its guarded action before option price commitment.
Pricing multiplies each line quantity by its unit price in USD and subtracts the line discount in USD. It sums the resulting net lines into the quote amount after checking the draft, expected revision, price book revision and line values.
Pricing Reviewer records Return with a reason. Quote Specialist uses that reason to prepare the correction. Agree how returned offers re-enter pricing during setup before requesting another decision. The earlier review history stays with the quote.
The acceptance action checks expiry and expected revision. Resolve the offer through the team's fresh preparation and review process before recording acceptance of a valid Approved revision.
Configure the downstream order connection during setup. Quote Specialist requests handoff for the Accepted revision, and the operation receipt retains the real result and external reference. Without that connection, the receipt stays Pending.
Use the correction action and have Pricing Reviewer authorize the compensating action. Keep the original acceptance and operation evidence available while the team follows the changed scope through its order connection.
Open Receipt Exceptions and compare the recorded claim with the quote, its lines and review decisions. Reconciliation can establish Completed from supporting evidence or flag the discrepancy for review with a concrete reason. It never repeats the external effect.
Quote attachments have Internal or Shared visibility, an evidence type and upload ownership. Agree the access rules and customer-document delivery process during setup. Follow the implementation plan to rehearse them.
Start free, then use Proto to change fields, steps and approvals before your team goes live.