All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. CPQ for Solar & Renewable Energy
  2. Process
  3. Hand off and reconcile accepted work
Process · Hand off and reconcile accepted work

Hand off and reconcile accepted work

Follow an accepted quote into the receiving system and reconcile each operation against real evidence.

Step by step

  1. Select accepted scope Quote Specialist

    Quote Specialist requests the handoff for an explicit Accepted quote revision. The handoff checks the accepted state, expected revision and preserved lines before contacting the configured order connection.

    • Accepted state and expected revision are checked
    • Updates Quotes, Quote lines
  2. Record the handoff outcome Quote Specialist

    The operation uses a stable key for that quote and revision. A downstream acknowledgement supplies the real external reference. Without a configured connection, the receipt remains Pending until an actual outcome can be established.

    • Stable operation key identifies the handoff and real external reference
    • Updates Operation receipts, Quotes
  3. Investigate exceptions Auditor

    Auditor reviews Pending, Failed and needs-review receipts. Compare each recorded claim with the quote, its lines and the review decisions. Keep the failure reason specific enough for the responsible person to investigate.

    • Claim is compared with its supporting records
    • Updates Operation receipts, Quotes, Quote lines, Review decisions
  4. Authorize compensation when needed Quote Specialist

    Quote Specialist raises a correction for executed accepted scope. Pricing Reviewer approves the compensating action before it proceeds, preserving the original commercial and operation evidence.

    • Reviewer-authorized correction preserves prior evidence
    • Updates Quotes, Review decisions, Operation receipts
    ApprovalA person approves before the work moves on.
  5. Reconcile completion Auditor

    The internal reconciliation action checks Pending, Failed and needs-review receipts. It records Completed when effects have real support and routes discrepancies for review with an explanation. Auditor reads the outcome and traces its evidence to the local and downstream records.

    • Auditor verifies the result recorded by internal reconciliation
    • Updates Operation receipts

Where it usually breaks

And how to keep it from happening.

  • A Pending connection request is described as a completed downstream order without a real reference.
  • A repeated handoff creates another operation instead of resolving the stable operation key.
  • Someone edits accepted lines directly while trying to correct an executed commitment.
Quote Specialist
Prepare assigned draft quotes, quote lines, solar design inputs and attachment records; guarded workflows own protected transitions.
Pricing Reviewer
Read authorized CPQ evidence and use guarded independent-review actions without unrestricted record editing.
Auditor
Read authorized CPQ records and evidence with access to operational reports only.

Set up CPQ for Solar & Renewable Energy your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appCPQ for Solar & Renewable Energy

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.