Where it usually breaks
And how to keep it from happening.
- A frequency-band label means different things to the preparer and reviewer. Agree the notation and source of technical evidence before the pilot.
- A changed configuration is acted on using an earlier revision. Require a fresh review of the actual request.
- A configuration belongs to the wrong organization or parent quote. Resolve the reference before submission.
- An approved requirement is described as automatic engineering certification. Keep the technical judgment with the qualified people responsible for it.