Process · Service change control

Service change control

A service change needs a risk decision, a planned window and a usable rollback plan before implementation. Review the linked service and have the operator verify the observed outcome.

Step by step

  1. Change planning Service Operator

    Service Operator links the service, records the risk, window and rollback plan, and moves Draft to Review.

    • Move Draft to Review with risk and window
    • Updates Changes
  2. Change review Service Operator

    Service Operator checks the service and planned window against the risk and recovery path.

    • Check window and rollback plan
    • Updates Changes
  3. Change approval Service Operator

    Service Operator approves a complete Review entry or moves it to Rejected.

    • Move Review to Approved or Rejected
    • Updates Changes
    ApprovalA person approves before the work moves on.
  4. Implementation Service Operator

    Service Operator moves Approved to Implementing when work begins.

    • Move Approved to Implementing
    • Updates Changes
  5. Verification Service Operator

    Service Operator checks the outside acknowledgment and observed result before moving Implementing to Verified, or records rolled back after recovery.

    • Move Implementing to Verified or rolled back
    • Updates Changes, Integration receipts