Connect approved customer demand to the work and material that will fulfill it. Production and quality supports MRP, work-order execution and inspection while preserving the quantities and costs needed to explain each finished lot.
OverviewShop Floor Schedule×
Education & School ERP · Production and quality
New
Shop Floor Schedule
Work order operations
| Work order | Operation number | Description | Work center | Operator | Planned start | |
|---|---|---|---|---|---|---|
| Bind grade six workbooks | 90 | Cut shelf panels to size | Distribution packing station | Mateo Alvarez | 06 Nov | |
| Print term enrollment packs | 30 | Bind grade six workbook pages | Print room, north campus | Asha Nair | 19 Oct | |
| Assemble classroom science kits | 10 | Assemble classroom science kit | Bookbinding bench | Minh Nguyen | 06 Nov | |
| Print term enrollment packs | 50 | Receive adjustable lab stools | Bookbinding bench | Fatima Bello | 18 Oct | |
| Prepare library shelf units | 80 | Record campus supply expense | Lab equipment test bench | Rafael Costa | 04 Nov |
6 of 6 records
Cut shelf panels to sizeWork order operations · WOO-22310
PendingWork orderBind grade six workbooks
Operation number90
Work centerDistribution packing station
OperatorMateo Alvarez
Planned start06 Nov
What you can do
Assemble real supply packs
Use bills of material and work orders for physical classroom or administrative packs when assembly is part of campus operations. The released pack identifies its components and instructions. Production records actual issues, loss and accepted pack output. A learner enrollment or timetable entry cannot create a work order, shipment or finished-stock quantity.
Plan from one remaining demand population
Production Planner runs MRP for a stated entity, warehouse and horizon. The run captures demand, eligible stock, remaining purchase and work-order supply, lead times and planning parameters. Every planned order stays pegged to a stable source requirement.
Approved sales lines, delivery-based contract cycles and safety-stock needs enter the appropriate planning population. When a contract cycle generates an order, that order replaces the cycle’s demand. Direct recurring service billing creates no physical demand, and firmed supply is not recreated on the next run.
The calculation nets remaining quantities rather than full original orders. Held, expired, quarantined or already-reserved stock is not treated as freely available. Missing dates, conversions or engineering inputs remain visible in MRP Exceptions for the planner and Buyer to resolve.
Release a reviewed production basis
| Release input | What stays with the work order |
|---|---|
| Bill of material | The exact revision, component quantities, scrap allowance and unit conversions |
| Routing | Operation sequence, setup/run basis and required quality checkpoints |
| Cost | Separate material, labour and overhead standards with the captured rates |
| Demand | The approved quantity, sourcing scope and customer requirement |
Production Planner firms and releases the reviewed plan. The work order receives its own snapshot rather than looking up current master values whenever it runs. An engineering change after release needs a controlled revision and assessment of work already performed.
This scope provides work-centre planning and operation coordination. Finite multi-plant optimization remains separate Manufacturing ERP scope. A planned date is not a guarantee that material or inspection constraints have been satisfied.
Issue components once
Components identify source warehouse, material unit and the work-order requirement. Warehouse Operator or an authorized Operator issues against the exact stock reservation. The physical issue and its WIP valuation use the captured transaction cost and consume the claim together.
Backflush is permitted only for its configured component scope and actual eligible completion. Explicit issues and backflush must not charge the same requirement twice. Returns identify the original issue, available unused quantity and original cost, including any downstream consumption constraints.
A replayed source event returns the original movement and journal identities. It does not issue another quantity, and an edited status cannot restore stock that was already consumed or shipped.
Report operations without multiplying output
Operator records time, good quantity and scrap against the actual operation and production lot. Plant Manager assigns eligible operators, reprioritizes work and handles allowed work-centre reassignment under the released plan. Holds remain visible to the planner and the customer-facing order.
Operation counts describe work performed at that step. Finished quantity comes from eligible terminal-operation completion, not the sum of good units reported at every operation. Rework and repeated inspection do not create another population of new finished goods.
Approved timesheet allocations carry their work-order, operation and cost-centre basis into labour absorption. Production reporting and payroll reference the same approved source scope so recalculation cannot cost or pay it again.
Release only the inspected quantity
Quality Inspector assesses the exact receipt or production scope at its required revision. Presented, accepted, rejected and unresolved quantities reconcile, with separate identities where a lot receives different dispositions.
A first-article pass authorizes the defined continuation; it does not accept the entire batch for shipment. In-process decisions release only their eligible scope. Final acceptance is required where the plan calls for it before stock becomes available to a sales order.
Rejected output remains held for rework, scrap or return disposition. Plant Manager can stop work but cannot substitute their own status edit for the inspector’s release. Reinspection links to its earlier scope so the same accepted pieces cannot be received twice.
Receive completion and review variance
Accepted eligible terminal output posts a bounded finished-stock receipt with its lot or serial identity and the corresponding WIP relief. Partial completion leaves the unfinished quantity and cost in WIP. Closing the work order requires its remaining material, output, quality and financial obligations to be resolved.
Production Planner reviews and authorizes close with the required Controller variance evidence. Material usage, labour efficiency, rate and overhead absorption differences have separate frozen bases. A single burdened rate cannot explain every variance without those components.
Payroll expense reconciles with absorbed labour rather than being added to WIP a second time. Posted adjustments retain signed source history and valid periods, including later corrections to approved time.
Follow the work and its evidence
Shop Floor Schedule and My Operations Today show the current assigned work. Production Attainment uses unique eligible output against planned demand. Inventory Valuation follows the captured costing method, and opening in-flight quantities use a reviewed migration baseline without generating new production or cost effects.
What it keeps track of
Data model- BOMs
- Bill of material header: the recipe for a made product, versioned by engineering revision.
- BOM components
- Each raw material, component or sub-assembly consumed to build one unit of the parent.
- Routings
- Routing header: the sequence of operations to build a product, versioned with the BOM.
- Routing operations
- Each operation in the routing: where it runs, how long setup and run take, whether it needs inspection.
- Work centers
- Machines, cells and assembly stations with capacity and a burdened hourly rate.
- Planned orders
- What the MRP run proposed: a work order for a made item or a purchase for a bought item, pegged to the demand that caused it, with the exception the planner or buyer has to act on.
- Work orders
- Released BOM/routing/cost snapshots, material and labour provenance, accepted terminal output and reviewed remaining WIP/variance close.
- Work order components
- Exploded bill demand for a work order: what is needed, from where, and how much has been issued.
- Work order operations
- Exploded routing steps for a work order: what runs where, in what sequence, by whom.
- Production log
- Timestamped operation throughput, time and scrap observations. Intermediate throughput is not finished production.
- Quality inspections
- Inspections on a receipt line, an operation, a customer return or a final release, with the disposition that moves the stock or the operation.
- MRP runs
- Reproducible entity/warehouse/horizon demand-and-supply snapshot with stable pegging and firm-order deduplication.
- Production completions
- Accepted terminal output is the only production source of finished quantity and cost transfer.
- Work order cost entries
- Append-only material, labour, burden, completion and variance effects retain original quantity and value sources.
Who uses it
Permissions- Production Planner
- Owns planning, release and close.
- Plant Manager
- Coordinates the floor and approved time.
- Operator
- Reports assigned work.
- Warehouse Operator
- Handles material.
- Quality Inspector
- Controls dispositions.
- Buyer
- Sources shortages.
- Controller
- Reviews financial variance.
Set up Education & School ERP your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.