All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Environmental Compliance
  2. Features
  3. Assessment testing
Feature · Assessment testing

Assessment testing

Plan a review period and keep individual test evidence tied to its controls.

OverviewControl test exceptions
Environmental Compliance · Assessment testing

Control test exceptions

Assessment tests

New
ParentControlControl codeTested atResultException count
North plant air permit, Q3Storm drain cover inspectionAIR-CTRL-01416 NovFail39
East yard stormwater auditWaste drum label reviewWTR-CTRL-00813 NovInconclusive29
Hazardous waste storage reviewMonthly stack sampler calibrationSTM-CTRL-00615 NovFail20
Cooling tower water assessmentQuarterly permit limit reviewWST-CTRL-00309 NovInconclusive26
East yard stormwater auditStorm drain cover inspectionCOOL-CTRL-01116 NovFail4
6 of 6 records
AIR-CTRL-014Assessment tests · AT-38418
Fail
ParentNorth plant air permit, Q3
ControlStorm drain cover inspection
Tested at16 Nov
Exception count39
Evidence referenceTEST-EVD-2026-411
Example screen with sample data

What you can do

Run the period from a single assessment

The assessment identifies the subject, period, scope, organization, business unit and owner. Its planned test count gives the owner a target for preparation. The status follows work from draft through planning, testing, review, approval, remediation and closure. The Operations Overview gives the lead a place to see control testing and exceptions alongside permit measurements needing attention.

Each test is an individual record under the assessment. It names the linked control, line number and revision; it can record a test date, sample size, exception count, result and evidence reference. A pending result differs from a pass, failure or inconclusive result. The owner should use the test record to explain what was checked, then use a finding when a failed or inconclusive result needs assigned corrective work.

How the work is organized

  • Period. Set the start and end dates, subject and scope before asking testers to work.
  • Test line. Keep the control link and result on each test, with an evidence reference people can follow.
  • Exception. Open a finding against the assessment and control when the result calls for corrective work.

What to agree during setup

Agree how many tests the assessment owner expects and how the team will identify each line. Decide what evidence reference is sufficient for a pass and what explanation is needed for an inconclusive result. The test result alone does not explain a failed sample; the related finding should state the issue in terms an action owner can investigate. Agree who reviews the assessment before it is approved and how remediation affects closure.

A pilot should use a complete period with at least one ordinary passing test and one exception. Let the lead compare the planned count with entered test lines, and inspect the linked control on each exception. The independent reviewer should see the evidence without relying on the tester’s memory or a private folder.

Check the handoff on an actual case

An assessment owner opens a spring review for a treatment unit and plans tests against its active controls. A tester records a sample of discharge log entries for one control. Most samples support the control, but one lacks the required operating record. The tester marks the line as failed, records the exception count and identifies the evidence. The lead opens a finding tied to that control and assessment, assigns corrective work, and leaves the assessment in a stage that reflects unresolved work.

Later, a separate reviewer looks at the corrective evidence and enters a retest. The assessment owner can trace that outcome back to the original line and explain why the period was approved or kept open. This matters when the period also contains permit measurements under independent review.

What your team sees

  • Assessments in progress — See periods that need testing, review or remediation.
  • Control test exceptions — Find failed or inconclusive lines with their evidence references.
  • Assessment workboard — Move through status groups without losing the named owner.

Follow the work through

What it keeps track of

Data model
Assessments
Compliance assessment periods covering planned tests and review.
Assessment tests
Individual evidence-based control tests within an assessment.
Controls
Controls mitigating a risk, with owner and effective date.
Findings
Issues raised from failed or inconclusive control testing.
Corrective actions
Remediation work assigned against a finding.
Retests
Independent retests that verify corrective action effectiveness.

Who uses it

Permissions
Assessment Owner
Plans testing and resolves the assessment’s evidence gaps.
Control Owner
Maintains control descriptions and responds to test exceptions.
Compliance Lead
Owns assessment scope and the operating review cycle.
Independent Reviewer
Decides submitted readings and independently retests corrective work.

Set up Environmental Compliance your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appEnvironmental Compliance

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.