All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Environmental Compliance
  2. Features
  3. Findings and remediation
Feature · Findings and remediation

Findings and remediation

Turn test exceptions into owned actions and independent retests.

OverviewMy corrective actions
Environmental Compliance · Findings and remediation

My corrective actions

Corrective actions

New
FindingDue atCompleted atStatusOwnerEvidence
Discharge sample exceeds acidity range24 NovPlannedElena Fischersampler_calibration_2026.pdf
Discharge sample exceeds acidity range13 NovIn progressOmar Diallooutfall_resample_2026.csv
Permit report submitted late11 NovSubmittedRavi Menondrain_cover_repair.jpg
Cooling sample log has gaps24 NovVerifiedNoah Kimwaste_label_inspection.pdf
Fuel bund drain valve unsecured17 NovPlannedLeo Ferreiracooling_sample_log.xlsx
6 of 6 records
sampler_calibration_2026.pdfCorrective actions · CA-94956
Planned
FindingDischarge sample exceeds acidity range
Due at24 Nov
OwnerElena Fischer
Example screen with sample data

What you can do

Keep the issue separate from its repair

A finding records the issue discovered in control testing. It links to the assessment and control, carries a severity and opened date, and moves through open, action-planned, retest and closed states. That record explains what went wrong. A corrective action is a separate assignment against the finding. It has an owner, due date, evidence, completion date and its own progress status. Keeping those records distinct lets the team see whether an issue exists, whether work is assigned and whether the work was independently checked.

A retest also belongs to the finding. It records the reviewer, test date, result and evidence. The reviewer can mark the result as pass, fail or inconclusive. The action owner may document completion, but an independent retest tells the compliance lead whether the correction addressed the original issue.

How the work is organized

  • Finding. State the issue, severity and affected control under the assessment.
  • Action. Give the correction a named owner, due date and written evidence.
  • Retest. Have a separate reviewer examine the result and record the outcome.

What to agree during setup

Choose how severity levels affect review order and who is allowed to close a finding. Agree what counts as sufficient corrective evidence and when an action can be submitted for verification. The action owner should be able to explain the remedy without editing the original test result. The reviewer needs a clear way to record an unsuccessful retest and send the finding back for more work.

The pilot should include a failed test, a finding, a planned action and a retest. If the first retest is inconclusive, the team should keep the case visible until it receives enough evidence. The compliance lead should review due dates and unresolved findings before closing the assessment.

Check the handoff on an actual case

A control test finds that a monitoring log was incomplete for a sampled period. The compliance lead opens a high-severity finding against the affected control. The action owner receives a due date and records how the log process was corrected, with supporting evidence. After completing the work, the owner submits the action. A separate reviewer performs a retest of the same control and records a passing result with the test evidence.

The finding can then move from retest to closed, and the action can be verified. If the reviewer instead records fail, the lead keeps the issue open and assigns further correction. The original failed test, action and retest remain linked so someone examining the assessment later can follow what changed and why closure was justified.

What your team sees

  • Open findings — Prioritize unresolved issues by severity and related control.
  • My corrective actions — Show an action owner their assigned work and due dates.
  • Retests requiring follow-up — Keep failed and inconclusive verification visible.

Follow the work through

What it keeps track of

Data model
Findings
Issues raised from failed or inconclusive control testing.
Corrective actions
Remediation work assigned against a finding.
Retests
Independent retests that verify corrective action effectiveness.
Assessment tests
Individual evidence-based control tests within an assessment.
Controls
Controls mitigating a risk, with owner and effective date.
Assessments
Compliance assessment periods covering planned tests and review.

Who uses it

Permissions
Action Owner
Documents remediation against an assigned finding.
Independent Reviewer
Decides submitted readings and independently retests corrective work.
Compliance Lead
Owns assessment scope and the operating review cycle.
Control Owner
Maintains control descriptions and responds to test exceptions.
Assessment Owner
Plans testing and resolves the assessment’s evidence gaps.

Set up Environmental Compliance your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appEnvironmental Compliance

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.