All applications611

Find your application

611 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Printing & Packaging ERP
  2. Features
  3. Assembly and kitting
Feature · Assembly and kitting

Assembly and kitting

Release bounded assembly work with a frozen recipe and measured output.

OverviewWork orders awaiting release
Printing & Packaging ERP · Assembly and kitting

Work orders awaiting release

Approval conditions

New
Work order numberOutput productPlanned quantityBOMRoutingStatus
WO-10640PRD-7293730BOM-7434RTN-6123Pending approval
WO-92660PRD-3677740BOM-5439RTN-4356Pending approval
WO-47889PRD-1464200BOM-3596RTN-6562Pending approval
WO-73309PRD-3721870BOM-5282RTN-4269Pending approval
WO-74998PRD-7802790BOM-7684RTN-4717Pending approval
6 of 6 records
PRD-7293Work orders · WO-10640
Pending approval
Planned quantity730
BOMBOM-7434
RoutingRTN-6123
Example screen with sample data

What you can do

Release bounded assembly work with a frozen recipe and measured output

The bill of materials describes an output product and component quantities per explicit output basis. Routings order operations with instructions and labor or overhead bases. Work orders freeze the selected recipe, routing, output standard and planned quantity when released. A printing or packaging company can use this flow for stocked kit or repack work where those product and component records fit its process.

Warehouse Manager reviews release evidence before a work order becomes Released. Material reservations and issues remain linked to work order components. Assigned operations have planned start and end dates; The production log records actual good quantity, scrap and labor hours. Production completions record accepted terminal output and its allocated work-in-progress cost. Closing the order requires the residual variance to be addressed through the reviewed decision.

How the work is organized

  • Source. Keep the responsible entity, original document and current revision attached to the transaction.
  • Decision. Send material releases and exceptions to the named reviewer with the exact scope and reason.
  • Result. Record actual quantities and financial effects separately from plans and instructions.

What to agree during setup

Agree on base units, recipe versions, material issue locations and the operation that represents terminal output. Set standard cost and posting profiles before first production. Assign a responsible manager and confirm who records actual operation evidence.

Choose one output product, its base unit and a current recipe and routing. Define which operation is terminal output and who records actual issues, returns, good quantity, scrap and labor. Warehouse Manager releases the frozen work order; Finance Manager reviews a residual cost variance at close. Try each decision with ordinary accounts.

Check the handoff on an actual case

Release a small kit run from a frozen bill of materials. Issue part of the required components, record good output and scrap at the assigned operation, and post a partial completion. Compare remaining material, work-in-progress cost and planned output before closing. Repeat the completion request and check that it cannot allocate the same cost source twice.

Warehouse Manager should explain planned output, accepted completion and the unfinished remainder. Warehouse Operator should find the assigned operation and its actual material and labor evidence. Accountant should trace the work-in-progress cost used by the partial completion; repeating the same completion must not consume it twice.

What your team sees

  • Work orders awaiting release — Work orders waiting for release with output product, recipe and planned quantity.
  • Work order schedule — Released and active work by planned start and end dates.

What it keeps track of

Data model
Bill of materials
Effective distribution assembly/repacking recipes with explicit output basis.
BOM components
Component quantities per explicit output basis, preserving dimensions and allowed loss.
Routings
Versioned assembly/repacking instructions, distinct from delivery routes.
Routing operations
Ordered work instructions and declared labour/overhead bases.
Work orders
Released bounded assembly/kitting/repacking, without plant APS or payroll scope.
Work order components
Frozen required input and actual traced issue/return scope.
Work order operations
Frozen instructions and assigned actual work.
Production log
Actual operation throughput, scrap and labour evidence; intermediate counts do not sum to output.
Production completions
Accepted terminal output and WIP cost allocation, once per actual completed scope.
Work order cost entries
Immutable WIP debit/credit sources and bounded actual-cost allocation.

Who uses it

Permissions
Warehouse Manager
Approves release and close.
Warehouse Operator
Records assigned operations.
Finance Manager
Reviews cost variance decisions; Accountant reconciles work-in-progress.

Set up Printing & Packaging ERP your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started