All applications611

Find your application

611 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Shipbuilding ERP
  2. Features
  3. Assembly and repacking
Feature · Assembly and repacking

Assembly and repacking

Release bounded assembly work against recipes, operations, issued material and cost.

OverviewMy operation assignments
Shipbuilding ERP · Assembly and repacking

My operation assignments

Work order operations

New
Work orderRouting operationPlanned startPlanned endActual startActual end
WO-69115RO-284216 Oct22 Oct24 Oct28 Oct
WO-70708RO-100903 Oct07 Oct10 Oct12 Oct
WO-94999RO-479923 Oct26 Oct03 Nov06 Nov
WO-49075RO-616822 Oct27 Oct03 Nov07 Nov
WO-37219RO-893422 Oct29 Oct01 Nov04 Nov
6 of 6 records
WO-69115Work order operations · WOO-84618
Ready
Routing operationRO-2842
Planned start16 Oct
Planned end22 Oct
Actual start24 Oct
Actual end28 Oct
Example screen with sample data

What you can do

Start with an effective recipe

Warehouse Manager uses a bill of materials and a production routing to define a kit or repacked output. The recipe states the output basis and each component quantity. Operations name the ordered instructions, labour basis and terminal operation. Product and unit versions matter because a changed master must not recalculate an accepted work order after material is issued.

A work order names its legal entity, warehouse, output product, planned quantity, manager, effective recipe, routing and output standard. Its release is a human decision on the frozen scope. Material reservations and issues then trace each required component. Actual production entries capture throughput, scrap and labour at an operation; intermediate good counts cannot be added together as finished output.

How the work is organized

  • Frozen basis. The released work order retains the recipe, routing, quantity and standard used to approve it.
  • Actual work. Assigned operations record start, end, good quantity, scrap and labour evidence.
  • Cost relief. Completion allocates actual WIP to accepted terminal output and records the variance separately.

What to agree during setup

Agree who owns the recipe and who independently activates changes to it. Define product-specific units, allowed planned loss, operation sequence and the output standard. Warehouse Manager decides whether material and labour evidence is sufficient to release and close a work order. Finance Manager reviews required variance or cost decisions; Accountant reconciles WIP and postings. A customer order line may be linked to the work order, but the output remains a product quantity in a warehouse, with its own stock event.

Choose how warehouse staff record issue, return and scrap. Unused issued components should be returned explicitly. A partially completed work order retains its remaining planned and material scope, rather than presenting the full planned quantity as finished stock.

Check the handoff on an actual case

Build a packaged set of stocked components for a customer order. The approved recipe specifies input quantities for a stated output basis. Release the work order only after the right output product, standard, routing and positive planned quantity are present. Reserve the material, issue only what the first run needs and record the actual operation. If some input is scrapped, retain the scrap quantity and cost evidence rather than hiding it in finished units.

Confirm a terminal completion for the accepted output. It should create stock once and relieve only the WIP assigned to that completion. Another operation entry cannot create a second finished batch from the same terminal quantity. Before closing, reconcile remaining material, output and variance; an independent decision is needed where residual variance requires one.

What your team sees

  • Production schedule — Warehouse Manager sees released work and planned start and end dates.
  • My operation assignments — Warehouse Operator records assigned operations and actual work.
  • Warehouse availability — The team sees accepted output once it has become owned stock.

Follow the work through

What it keeps track of

Data model
BO ms
Effective distribution assembly/repacking recipes with explicit output basis.
BOM lines
Component quantities per explicit output basis, preserving dimensions and allowed loss.
Production routings
Versioned assembly/repacking instructions, distinct from delivery routes.
Routing operations
Ordered work instructions and declared labour/overhead bases.
Work orders
Released bounded assembly/kitting/repacking, without plant APS or payroll scope.
Work order components
Frozen required input and actual traced issue/return scope.
Work order operations
Frozen instructions and assigned actual work.
Production log
Actual operation throughput, scrap and labour evidence; intermediate counts do not sum to output.
Production completions
Accepted terminal output and WIP cost allocation, once per actual completed scope.
Work order cost entries
Immutable WIP debit/credit sources and bounded actual-cost allocation.
Inventory
Current owned stock by complete identity and custody state; provenance is not a second balance.
Stock events
One immutable group of stock movements and the associated journal effect.

Who uses it

Permissions
Warehouse Manager
Reviews release and completion.
Warehouse Operator
Records assigned physical work.
Finance Manager
Reviews standards and required variance decisions.
Accountant
Reconciles WIP and posted output.

Set up Shipbuilding ERP your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started