Process · Consumption to production cost

Consumption to production cost

Compare validated consumption with effective rates and explain its allocation to production references.

Step by step

  1. Select the operating period Energy Manager

    Energy Manager identifies validated consumption for the meter and period being assessed. Cost Analyst checks the actual boundaries and unit before comparing that quantity with a rate or production allocation.

    • Select validated quantities and units
    • Updates Energy intervals, Meters
  2. Find the effective rate Cost Analyst

    Cost Analyst follows the meter to its site and examines tariff start and end dates. Select a rate only when the period and unit are compatible. Resolve overlapping rate periods before using the comparison in a cost total.

    • Match site, unit and effective period
    • Updates Tariffs, Sites, Meters
  3. Record the production allocation Cost Analyst

    Cost Analyst enters the work order reference, meter and actual allocation interval. Record the attributed kilowatt-hours and explain the allocation method, especially where several production runs share the meter.

    • Attribute energy to a work order reference
    • Updates Production allocations, Meters
  4. Validate the attribution Cost Analyst

    Validation checks the attributed allocation and preserves its actual interval. Correct negative quantities or reversed periods using the rejection reason, then revalidate. Review the corrected row before including it in the comparison.

    • Return Valid or Rejected with reasons
    • Updates Production allocations
  5. Explain the result Energy Manager

    Cost Analyst uses the agreed cost calculation and compares valid allocations with consumption over compatible periods. Energy Manager reviews differences with the operating context. Identify any unresolved rate or allocation question alongside the result.

    • Review compatible cost and allocation comparisons
    • Updates Energy intervals, Tariffs, Production allocations

Where it usually breaks

And how to keep it from happening.

  • A tariff’s start date qualifies but its end excludes the period. Review both boundaries.
  • A production allocation covers only part of the meter interval. Align the comparison before discussing the quantity difference.
  • A work order reference differs from the production team’s identifier. Agree the reference convention before importing allocations.
Energy Manager
Reviews meter evidence and authorizes the operating response and recovery review.
Cost Analyst
Reviews effective energy rates and allocates metered energy to production references.
Admin
Maintains application access and the site and meter foundation.

Set up Factory Energy Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appFactory Energy Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.