Process · Delivery and authorized correction

Delivery and authorized correction

Dispatch follows observed movement while keeping the original delivery commitment available. A completed delivery and an exception require different evidence. When the plan breaks, the supervisor decides what can be corrected or canceled without losing the record of work already performed.

Step by step

  1. Record movement Dispatcher

    The Dispatcher records the load as in transit when movement is observed. Retain actual stop arrivals and departures with their proof references. Keep the original promised delivery time available while discussing progress with the transport partner.

    • Dispatched to in transit with actual stop evidence
    • Updates Loads, Load stops
  2. Complete delivery Dispatcher

    When the recipient receives the load, record actual delivery and the completion action. The load moves from in transit to Delivered, with the original promise retained. Complete the relevant assignment and inspect the delivery receipt.

    • In transit to Delivered; assignment Completed
    • Updates Loads, Load assignments, Operation receipts
  3. Review an exception Transport Supervisor

    If the remaining movement cannot proceed as planned, the Dispatcher presents the excepted load and its retained actual evidence. The Transport Supervisor authorizes the appropriate correction or cancellation of unexecuted scope. Record the current revision and the reason for the decision.

    • Current remaining scope reviewed and authorized
    • Updates Loads, Review decisions, Record attachments
    ApprovalA person approves before the work moves on.
  4. Retain the correction outcome Dispatcher

    Keep the compensating action receipt with the original operating evidence. After authorization, mark the excepted load canceled for its unexecuted scope. Confirm externally controlled effects with their responsible source; a local correction does not automatically reverse them.

    • Compensating evidence; authorized Exception to Cancelled
    • Updates Operation receipts, Loads, Load stops

Where it usually breaks

And how to keep it from happening.

  • Lost delivery promise. A revised estimate replaces the original commitment used for lateness comparison.
  • Too much scope canceled. A correction fails to distinguish completed physical work from the unexecuted portion.
  • Financial assumption. Delivered status is interpreted as settlement of the carrier invoice without accounting evidence.
Dispatcher
Plans loads, checks assignment feasibility and submits maintenance release work before dispatching the intended scope.
Transport Supervisor
Independently reviews maintenance release and authorized corrections while overseeing unresolved operating outcomes.
Fleet Coordinator
Maintains vehicle readiness, driver eligibility references and transport partner information for dispatch review.
Operations Analyst
Reviews scoped load performance, decisions and retained action evidence without changing operating outcomes.

Set up Fleet Management System your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appFleet Management System

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.