Where it usually breaks
And how to keep it from happening.
- Wrong subject. Similar inspection numbers can conceal a different fixture or operation. Check the subject reference and linked evidence together.
- Unfinished evidence. A request to accept work does not replace the required check observations. Rehearse an incomplete submission.
- Stale work. A delayed command must not silently act on an inspection that changed after the Inspector opened it.