All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Organic Certification Tracker
  2. Features
  3. Certification scopes
Feature · Certification scopes

Certification scopes

Maintain the operator, location, certified area and status for each scope.

OverviewActive Certification Scopes
Organic Certification Tracker · Certification scopes

Active Certification Scopes

Certification scopes

New
Field codeOperator nameLocationCertified hectaresCertification status
NORTH-ORCHARD-01North Orchard Block, Fernbank FarmsNorth orchard, east of packing shed250Available
CEDAR-MEADOW-02Cedar Meadow Parcel, Willow Vale GrowersCedar meadow, lower valley730Planted
UPPER-TERRACE-03Upper Terrace Field, Stonebrook OrganicsUpper terrace above west access road650Available
RIVERBEND-EAST-04Riverbend East Plot, Alder Grove ProduceRiverbend east of irrigation canal480Planted
SOUTH-PASTURE-05South Pasture, Briar Hill FarmSouth pasture beside service gate20Available
6 of 6 records
NORTH-ORCHARD-01Certification scopes · CS-91036
Available
Operator nameNorth Orchard Block, Fernbank Farms
LocationNorth orchard, east of packing shed
Certified hectares250
Example screen with sample data

What you can do

Keep the working record clear

The scope is the starting record for an operator and parcel. Operations Manager maintains its field code, operator name, location, certified hectares and certification status. Audits, boundary surveys, inspection checks, input reviews and corrective actions each reference that scope. Open those records from the same scope when the team needs to explain a change.

A parcel moves from Available to Restricted after the team reviews its current position. Operations Manager checks the field code and operator name before recording Restricted. Quality Manager opens the audits and corrective actions for that scope to see which work remains. The status alone does not explain the reason, so the team checks the dated inspection and audit records before discussing the case with a certifier.

How the work is organized

  • Identify the parcel. Use the field code, operator and location together so similarly named fields do not get mixed up.
  • Keep areas distinct. Record certified hectares on the scope and surveyed hectares on the boundary record.
  • Follow related work. Open the audit, checks and actions linked to the same scope before changing its status.

What to agree during setup

Agree who maintains operator names and field codes, who can change a restricted scope and what evidence the team reviews first. Set a clear convention for location text so staff can find the same parcel from an audit or survey. Decide how to handle a new survey when its measured area differs from the certified area. The Operations Manager should update the responsible record after review; copying the survey number into the certified area would hide the distinction.

Check the handoff on an actual case

Take one parcel that was Available and is now Restricted. Ask Operations Manager to locate it by field code and explain the operator, location and current status. Open its boundary record and compare the survey date and measured hectares with the certified hectares on the scope. Then ask Quality Manager to open a planned audit and any action linked to the scope. If those records concern a different parcel, correct the reference at its source. Reopen the scope and related views to confirm that the same operator and parcel are visible throughout. Keep the formal certification decision with the certifier.

What your team sees

  • Active Certification Scopes — Find scopes marked Available or Planted and review the operator and area.
  • Restricted Scopes — Find Restricted scopes and open their related audit and action records.

Follow the work through

Follow the scope and audit process and the inspection and action process. Review the data model when preparing records for import.

What it keeps track of

Data model
Certification scopes
Registry of operations and parcels under organic certification: operator, certified hectares, location and certification status.
Certified parcel boundaries
Surveyed parcel geometry and measured area for each certification scope: Geo JSON, survey date and surveyed hectares.
Audits
Organic certification audits through a planned-to-closed lifecycle, with certification scope, standard, planned and completed dates.
Corrective actions
Assigned corrective work items raised from audit findings, with owner, due date and implementation status.

Who uses it

Permissions
Operations Manager
Owns certification scope and parcel information.
Quality Manager
Plans audit work and decides whether corrective actions may proceed.
Admin
Sets up user access and maintains master records.

Set up Organic Certification Tracker your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appOrganic Certification Tracker

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.