1. Construction PM
  2. Data model and import order
Reference

The tables behind Construction PM

Construction PM ships with 13 tables, grouped here by the feature that uses them. Every record your team works with lives in one of them, and you can add fields and tables in Proto.

Tables
13
Features
6, plus shared settings
Change it
Add fields and tables in Proto

How the model is organised

Project context:

Clients contractors, construction projects and trades crew establish the site, organization and responsible people.

Site plan:

Work packages and site tasks carry scope, dates, assignment, progress and labour estimates.

Site exceptions:

Site milestones, RF is site issues and construction risks hold due checkpoints, questions and mitigation.

Labour:

Timesheets link work dates and hours to crew members, projects and optional tasks.

Review trail:

Inspection evidence, submittal reviews and inspection receipts retain files, decisions and operation outcomes.

Access:

Users represents application identity and role status separately from the trades crew working directory.

Every table, by feature

Projects and contractors

8 tablesAbout this feature
  • Clients contractors

    Owners, clients, general contractors and subcontracting organisations engaged on construction projects.

  • Construction projects

    Construction projects and sites with contract value, programme dates and delivery progress.

    Linked to Clients contractors, Trades crew
  • Work packages

    Work packages that break a construction project into planned, priced and trackable scopes of work.

    Linked to Construction projects, Trades crew
  • Site tasks

    Site tasks inside a work package, with planned and actual labour hours against the programme.

    Linked to Work packages, Trades crew, Construction projects
  • Site milestones

    Site milestones certified against recorded inspection evidence before payment handoff.

    Linked to Construction projects, Trades crew
  • Construction risks

    Construction risks with probability, impact, score and mitigation for the project risk register.

    Linked to Construction projects, Trades crew
  • RF is site issues

    RF is and site issues raised against construction work, with severity, owner and resolution status.

    Linked to Construction projects, Trades crew
  • Timesheets

    Labour hours booked by a trade or crew member against a site task and construction project.

    Linked to Trades crew, Construction projects, Site tasks

Work packages and site tasks

5 tablesAbout this feature
  • Construction projects

    Construction projects and sites with contract value, programme dates and delivery progress.

    Linked to Clients contractors, Trades crew
  • Work packages

    Work packages that break a construction project into planned, priced and trackable scopes of work.

    Linked to Construction projects, Trades crew
  • Site tasks

    Site tasks inside a work package, with planned and actual labour hours against the programme.

    Linked to Work packages, Trades crew, Construction projects
  • Trades crew

    Trades, site staff and crew available to construction projects, with trade and crew capacity.

  • Timesheets

    Labour hours booked by a trade or crew member against a site task and construction project.

    Linked to Trades crew, Construction projects, Site tasks

Trades and labour time

6 tablesAbout this feature
  • Trades crew

    Trades, site staff and crew available to construction projects, with trade and crew capacity.

  • Site tasks

    Site tasks inside a work package, with planned and actual labour hours against the programme.

    Linked to Work packages, Trades crew, Construction projects
  • Timesheets

    Labour hours booked by a trade or crew member against a site task and construction project.

    Linked to Trades crew, Construction projects, Site tasks
  • Construction projects

    Construction projects and sites with contract value, programme dates and delivery progress.

    Linked to Clients contractors, Trades crew
  • Submittal reviews

    Submittal and inspection review decisions recorded against construction subjects.

    Linked to Trades crew, Construction projects
  • Inspection receipts

    Inspection receipts recording that an authorised construction operation was executed.

    Linked to Trades crew

RFIs and construction risks

6 tablesAbout this feature
  • RF is site issues

    RF is and site issues raised against construction work, with severity, owner and resolution status.

    Linked to Construction projects, Trades crew
  • Construction risks

    Construction risks with probability, impact, score and mitigation for the project risk register.

    Linked to Construction projects, Trades crew
  • Construction projects

    Construction projects and sites with contract value, programme dates and delivery progress.

    Linked to Clients contractors, Trades crew
  • Trades crew

    Trades, site staff and crew available to construction projects, with trade and crew capacity.

  • Inspection receipts

    Inspection receipts recording that an authorised construction operation was executed.

    Linked to Trades crew
  • Inspection evidence

    Inspection evidence, submittals, drawings and other documents attached to construction records.

    Linked to Trades crew

Milestones and site exceptions

7 tablesAbout this feature
  • Site milestones

    Site milestones certified against recorded inspection evidence before payment handoff.

    Linked to Construction projects, Trades crew
  • Site tasks

    Site tasks inside a work package, with planned and actual labour hours against the programme.

    Linked to Work packages, Trades crew, Construction projects
  • RF is site issues

    RF is and site issues raised against construction work, with severity, owner and resolution status.

    Linked to Construction projects, Trades crew
  • Construction risks

    Construction risks with probability, impact, score and mitigation for the project risk register.

    Linked to Construction projects, Trades crew
  • Construction projects

    Construction projects and sites with contract value, programme dates and delivery progress.

    Linked to Clients contractors, Trades crew
  • Inspection evidence

    Inspection evidence, submittals, drawings and other documents attached to construction records.

    Linked to Trades crew
  • Submittal reviews

    Submittal and inspection review decisions recorded against construction subjects.

    Linked to Trades crew, Construction projects

Reviews and inspection evidence

8 tablesAbout this feature
  • Inspection evidence

    Inspection evidence, submittals, drawings and other documents attached to construction records.

    Linked to Trades crew
  • Submittal reviews

    Submittal and inspection review decisions recorded against construction subjects.

    Linked to Trades crew, Construction projects
  • Inspection receipts

    Inspection receipts recording that an authorised construction operation was executed.

    Linked to Trades crew
  • Site tasks

    Site tasks inside a work package, with planned and actual labour hours against the programme.

    Linked to Work packages, Trades crew, Construction projects
  • Site milestones

    Site milestones certified against recorded inspection evidence before payment handoff.

    Linked to Construction projects, Trades crew
  • RF is site issues

    RF is and site issues raised against construction work, with severity, owner and resolution status.

    Linked to Construction projects, Trades crew
  • Timesheets

    Labour hours booked by a trade or crew member against a site task and construction project.

    Linked to Trades crew, Construction projects, Site tasks
  • Construction projects

    Construction projects and sites with contract value, programme dates and delivery progress.

    Linked to Clients contractors, Trades crew

Shared and settings

1 table
  • Users

    Users

    Linked to Users

Keys and references

Keep each project code, package code, task key and issue key stable through import. Resolve the organization and crew references before loading projects. Resolve a project’s packages before tasks; link timesheets to the intended project and optional task. Inspection evidence uses a parent type and text identifier, so check both against the source record. A review subject reference needs the correct subject type and related project.

A person in trades crew is a working resource. A Users entry is an account with a role and access status. Match identities deliberately when configuring personal work lists and permissions. Do not assume the two records are the same solely because a name matches.

Migration order

  1. Load clients contractors, trades crew and Users with stable identities and agreed access.
  2. Load construction projects with organization and project-manager references.
  3. Load work packages, then site tasks with matching package and project references.
  4. Load site milestones, RF is site issues and construction risks with owners and dates.
  5. Load Timesheets, inspection evidence and submittal reviews with source identifiers; compare approval and triage receipts after rehearsing the workflows.
  6. Reconcile project and package totals, review access and run the exception cases before opening a live site cycle.