  1. Power Plant Operations
  2. Process
  3. Inspect readings and validate energy
Process · Inspect readings and validate energy

Inspect readings and validate energy

Move from a meter observation to a reviewed energy interval.

Step by step

  1. Inspect the meter Plant Operator

    Plant Operator selects the installed meter and checks its reading mode.

    • Identifies how a reading should be interpreted.
    • Updates Meters, Sites
  2. Record the observation Plant Operator

    Plant Operator enters the reading time, value and quality flag.

    • Preserves the source observation.
    • Updates Meter readings
  3. Inspect the candidate Operations Reviewer

    Operations Reviewer checks a Received energy period for the same meter.

    • Keeps the period available for a decision.
    • Updates Energy intervals, Meter readings
  4. Decide the interval Operations Reviewer

    Operations Reviewer approves a usable period as Validated or rejects it as Rejected.

    • Records the reviewer decision on the interval.
    • Updates Energy intervals
    ApprovalA person approves before the work moves on.
Plant Operator
Records unit operating state, generation intervals, meter readings and operational events at the plant.
Operations Reviewer
Checks reading quality and decides whether a received energy interval is valid.

Set up Power Plant Operations your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appPower Plant Operations

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.