These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
- QMS for Electronics Manufacturing
- Process
- Inspection review
Inspection review
An inspection decision starts with a named subject and the person assigned to check it. The review depends on the recorded requirements, observations and evidence. A failed check should lead the reviewer to the affected scope before the inspection is accepted or rejected.
Step by step
-
Plan inspection Quality Manager
Quality Manager records the inspection type, subject reference, schedule and Inspector assignment. The inspection begins at Planned.
- Schedule and assign the work
- Updates Inspections, People
-
Start assigned work Inspector
Inspector opens the planned record and starts the work, changing its state to in progress. The subject reference should match the item physically presented for inspection.
- Mark the inspection in progress
- Updates Inspections
-
Record check evidence Inspector
Inspector completes each linked requirement with a result, observation and evidence where needed. A failed check retains the information that a reviewer will use to identify the failed scope.
- Preserve requirement, result, observation and attachment
- Updates Inspection checks, Inspections
-
Submit for review Inspector
Inspector sends the inspection from in progress to Review with the linked check set. Quality Reviewer checks failed scope and raises a linked nonconformance in Containment while the inspection awaits a decision.
- Put the checks before the reviewer and contain failed scope
- Updates Inspections, Inspection checks, Nonconformances
-
Decide the result Quality Reviewer
Quality Reviewer reads the check evidence and approves the outcome as Accepted or Rejected. The contained case remains linked to the inspection.
- Record Accepted or Rejected with the contained case linked
- Updates Inspections, Inspection checks, Nonconformances
ApprovalA person approves before the work moves on.
Who does what
Roles and permissions- Quality Manager
- Plans and assigns.
- Inspector
- Captures checks and submits.
- Quality Reviewer
- Decides and contains failed scope.
Set up QMS for Electronics Manufacturing your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.