All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Food and Beverage QMS
  2. Features
  3. Audits and documents
Feature · Audits and documents

Audits and documents

Keep audit findings, controlled revisions and training acknowledgments available to the quality team.

OverviewOpen findings
Food and Beverage QMS · Audits and documents

Open findings

Audit findings

New
AuditRequirementFindingSeverityOwnerDue date
Label approval process auditCook core reaches 82 C for 2 minCook chart lacked operator signoffObservationLeila Park26 Nov
Label approval process auditPeanut swab below release thresholdAllergen swab was taken too earlyMinorElise Rahman22 Nov
Packaging seal control auditFlour bag seal intact at receivingDamaged bag was not segregatedMajorOwen Duarte12 Nov
Label approval process auditDetector rejects 2 mm steel pieceDetector check log missed one hourObservationPriya Calder12 Nov
Cold chain monitoring auditPouch passes 30 kilopascal leak testSeal test sample count was shortMinorMarco Chen11 Nov
6 of 6 records
Cook core reaches 82 C for 2 minAudit findings · AF-51372
Observation
AuditLabel approval process audit
FindingCook chart lacked operator signoff
OwnerLeila Park
Due date26 Nov
Example screen with sample data

What you can do

Keep review records findable

Audits record a number, scope, planned date, completion date, status and auditor. Their findings carry a requirement, finding, severity, owner, due date and closure date. Controlled documents store a titled version, effective date, file and revision status. Training acknowledgments connect a person to a controlled document and records when that person acknowledged it. Together these records let the team answer which audit finding is open and which version a person acknowledged.

For an internal audit of a packaging line, Auditor plans the scope and date, then records a finding against a named requirement. A finding owner is assigned with a due date. The team can read the finding while the audit moves through reporting and can check the closure date when work is complete. Separately, Document Controller can put a revised work instruction into review, then make the approved version available for acknowledgments.

How the work is organized

  • Audit case. The audit holds scope, schedule, auditor and overall state.
  • Finding follow-up. Each finding identifies the requirement, issue, owner and closure date.
  • Revision evidence. A document version and its acknowledgments show what was available to the team.

An audit finding is linked to its audit. An acknowledgment is linked both to the document and the person, so a reviewer can follow each relationship directly. A document marked Approved identifies a reviewed revision in the list; the effective date clarifies when it applies.

What to agree during setup

Define how audit scope is written, who owns findings and what a closure date means. Agree how auditors use Observation, Minor and Major severity. For documents, settle the version naming convention, who reviews a revision and when the effective date is set. Decide who must acknowledge an approved document and how the team checks acknowledgments before a procedure changes in daily work.

The quality team should rehearse the document handoff with the people who actually use the instruction. If files are distributed through another document service, agree how the approved revision and acknowledgment record remain aligned.

Check the handoff on an actual case

Plan a packaging audit and enter a finding with an owner and due date. Have another person locate the open finding from the audit record and describe what remains to close it. Then create a revised controlled document, attach the file, set its review state, and have Document Controller verify the version and effective date. Ask a named person to acknowledge the approved revision. Finally, trace that acknowledgment back to the exact document version. This exercise tests both the audit and document review paths.

What your team sees

  • Open audits — Planned, active and reporting audits with an assigned auditor.
  • Open findings — Finding owners and due dates alongside unresolved issues.
  • Pending release — Controlled revisions awaiting the team’s release decision.

Follow the work through

What it keeps track of

Data model
Audits
Audits record for Quality & Compliance (Source).
Audit findings
Audit Findings record for Quality & Compliance (Source).
Controlled documents
Controlled Documents record for Quality & Compliance (Source).
Training acknowledgments
Training Acknowledgments record for Quality & Compliance (Source).
People
People records for Quality & Compliance (Source).

Who uses it

Permissions
Auditor
Plans audits and records findings.
Quality Manager
Reviews quality decisions.
Document Controller
Maintains revisions and acknowledgments.

Set up Food and Beverage QMS your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appQMS for Food and Beverage

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.