1. Manufacturing QMS
  2. Who it's for
  3. Process Production
Who it's for

Process Production

Process production teams can attach a sampled lot to an Inspection while retaining their own work order and product references. The lot record stores sample size and lot size. Inspector observations and check results sit under the inspection; defect observations sit under the lot. The Reviewer can follow both trails before deciding on the inspected scope.

How Manufacturing QMS is set up for you

Sample identity

Record the lot number and product code used on the floor so later reviewers can locate the same scope.

Requirement evidence

Use linked inspection checks to state what was observed and whether each requirement passed, failed or was not applicable.

Defect attribution

Record defective units, severity and date on the lot where the condition was found.

Issue closure

When a failed inspection creates a Nonconformance, keep corrective action linked until effectiveness is accepted.

Process production teams can attach a sampled lot to an Inspection while retaining their own work order and product references. The lot record stores sample size and lot size. Inspector observations and check results sit under the inspection; defect observations sit under the lot. The Reviewer can follow both trails before deciding on the inspected scope.

Choose one recurring inspection type and one production lot that the team can identify without ambiguity. The Inspector links the lot to the inspection, records its sizes and enters check observations. Add a defect observation if a condition is found. The Reviewer opens the lot and checks before accepting or rejecting the scope. This tests whether the recorded sample context is enough to explain the decision.

For a rejection, ask the Quality Manager to describe the affected scope and lead containment. Assign an owner to record root cause and corrective action. During rehearsal, hold the issue open while the action remains under effectiveness review. The result should trace from the sampled lot to the inspection decision and then to the linked correction. Agree how the quality team obtains the production identifiers before extending this pattern to more areas.

Features to start with

Roles on the team

Inspector
Records inspection checks, production inspection lots and defect observations for assigned work.
Reviewer
Decides whether reviewed inspections are accepted or rejected and opens containment work for failures.
Quality Manager
Owns nonconformance disposition and reviews the quality record across operations.
Corrective Action Owner
Investigates assigned nonconformances and submits corrective action evidence.
Admin
Configures access and maintains people and user records.

Set up Manufacturing QMS your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started