These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
- Manufacturing QMS
- Integrations
Integrations
Bring production identifiers and evidence into the quality record through agreed connections.
- Manufacturing QMS
- Production execution
- Product identity
- Document source
- People directory
Systems to connect
- Production execution. Agree how work order references, product codes and lot numbers reach the Inspector for Production Inspection Lots.
- Product identity. Align the product code and inspection subject reference with the identifiers used by your production team.
- Document source. Decide how controlled document attachments are prepared and versioned before Document Control records them.
- People directory. Match Users and People so assignments and acknowledgments point to the intended person.
How connections are governed
Start with the identifiers your team already uses. Assign an owner for each source and test a sample record through inspection, lot capture and review. Check that a changed production identifier or document version can be traced to the correct quality record before using it in a decision. See implementation for the rehearsal order.
Set up Manufacturing QMS your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.