All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Medical Devices QMS
  2. Features
  3. Documents and training
Feature · Documents and training

Documents and training

Keep controlled document versions and staff acknowledgments in a shared quality record.

OverviewDocuments in review
Medical Devices QMS · Documents and training

Documents in review

Approval conditions

New
TitleVersionEffective dateDocumentStatus
Catheter tubing incoming inspectionRev A12 Novtubing_incoming_rev_c.pdfReview
Infusion set device master recordRev B24 Novinfusion_set_dmr_rev_b.pdfReview
Sterile barrier seal test methodRev C25 Novsterile_seal_method_rev_d.pdfReview
Valve connector dimensional planRev D29 Novconnector_inspection_rev_a.pdfReview
Portable monitor service checklistRev E13 Novmonitor_service_rev_e.pdfReview
6 of 6 records
Catheter tubing incoming inspectionControlled documents · CD-78168
Review
VersionRev A
Effective date12 Nov
Documenttubing_incoming_rev_c.pdf
Example screen with sample data

What you can do

Know which revision a person acknowledged

Controlled documents keep a title, version, effective date, attachment and status. Training acknowledgments link a person to a controlled document and record when they acknowledged it. Together these records let the quality team look up the revision behind an acknowledgment. The documents can represent SOPs, work instructions or device master records used by the team.

The record link is the critical handoff. If a work instruction changes, the team needs to see which people acknowledged the controlled document. A dated acknowledgment without a document reference would be hard to interpret, and a document list alone would not show who has acknowledged it.

How the work is organized

  • Revision. Title and version distinguish one controlled document record from another.
  • Use. Effective date and status help the team identify the document intended for current work.
  • Acknowledgment. Each entry ties a person and an acknowledgment date to the controlled document.

For a revised inspection instruction, the Document Controller adds the new controlled document with its version and effective date. The team reviews its status and attachment. As inspectors acknowledge it, their entries point to that document. The quality manager can inspect the revision and the people who have acknowledged it before starting the next inspection cycle.

What to agree during setup

Agree how the team names documents and versions. Decide who changes document status and how a new version is introduced. Set the point at which staff acknowledgment is expected and identify which people must acknowledge the revision. The person records are linked to users, so access setup should reflect the actual staff who perform inspections, reviews and audits.

A pilot should use one document that matters to the inspection case. The controlled record should carry an attachment the inspector can identify, with a meaningful effective date. Acknowledgment entries should refer to the intended version. This gives the document team a concrete way to check its handoff.

Check the handoff on an actual case

Open a controlled instruction in review, inspect its title, version and file, then move through the agreed document decision. Record an acknowledgment for a named person and return to the controlled document to confirm the relationship. Compare that document with the instruction used in a pilot inspection. The team should be able to say which revision was available and who acknowledged it.

Also inspect an older document marked obsolete. The status should help the team distinguish it from the current approved record. Decide how the operating team will find the correct version from its day-to-day inspection work.

What your team sees

  • Documents in review — Revisions that need a document decision, with their version and effective date.
  • Training acknowledgments — People, documents and acknowledgment dates in one list.

Follow the work through

What it keeps track of

Data model
Controlled documents
Version-controlled SOPs, work instructions and device master records
Training acknowledgments
Staff acknowledgment of controlled document revisions
People
Quality staff, inspectors and approvers
Users
Sign-in accounts for the people who use the app.

Who uses it

Permissions
Document Controller
Maintains versions and acknowledgment records.
Inspector
And Quality Reviewer use the relevant controlled instructions.
Admin
Manages the people and user access behind those roles.

Set up Medical Devices QMS your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appQMS for Medical Devices

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.