Follow incoming, in-process, final and service inspections from assignment through reviewer disposition.
OverviewPlanned inspections×
Medical Devices QMS · Inspections
New
Planned inspections
Approval conditions
| Inspection number | Subject reference | Inspection type | Scheduled at | Assigned to | |
|---|---|---|---|---|---|
| INS-22848 | Planned ins-808 | Incoming | 21 Oct | ||
| INS-49873 | Planned ins-388 | In process | 21 Oct | ||
| INS-44810 | Planned ins-860 | Final | 18 Oct | ||
| INS-22570 | Planned ins-487 | Service | 14 Oct | ||
| INS-10529 | Planned ins-635 | Incoming | 17 Oct |
6 of 6 records
Planned ins-808Inspections · INS-22848
IncomingScheduled at21 Oct
What you can do
Start with the subject and the person responsible
An inspection gives the team one place to identify the item under review, the type of inspection and the person assigned to it. The subject reference should match the operating record your team uses to find the material, lot or service case. The scheduled date puts planned work in order. The inspector begins a planned inspection, records requirement checks and submits the result for review. The reviewer makes the final disposition of the inspection.
This sequence matters when several checks apply to one subject. A pass on one requirement does not settle a failure on another. Each check keeps its own requirement, observation, result and evidence attachment. The parent inspection gives the reviewer the complete scope before a decision.
How the work is organized
- Assignment. The inspection type, subject reference, scheduled date and assigned person explain what must be examined and who carries it.
- Evidence. Each linked check records the observed result against a named requirement and can hold an attachment.
- Disposition. The reviewer accepts eligible passing scope or rejects failed scope and raises a linked nonconformance for the failure.
A final inspection for a device lot can contain checks for packaging, labeling and the relevant work instruction. The inspector records the observation for each requirement. If labeling fails, the reviewer sees that failure next to passing checks and rejects the failed scope. The resulting nonconformance retains its link to the inspection.
What to agree during setup
Decide how subject references map to the manufacturing or service records your team already uses. Choose who creates planned work, who can record checks and who decides the review. Agree on which evidence belongs on a check and which belongs in a device history review or supplier certificate. These are distinct records linked to the operational inspection.
Use the inspection types consistently. Incoming covers received material, in process covers work during manufacture, Final covers completion review and Service covers service work. Agree what a reviewer needs to see before accepting an inspection, including how a failed or not-applicable check is explained. This gives both inspectors and reviewers the same rule for a pilot case.
Check the handoff on an actual case
Take one incoming component inspection from assignment to disposition. The Inspector checks the subject reference and records observations against the applicable requirements. Attach evidence to the checks that need it, then submit the inspection for review. The Quality Reviewer reads the checks in context and records the decision. If a check fails, follow the linked nonconformance from the rejected scope so the corrective action owner receives the same case that the reviewer decided.
Reopen the case as each role. The inspector should see the assigned work and submitted evidence; the reviewer should see the review queue and the reason for the decision. Confirm that the inspection number can be used to find the same record during follow-up.
What your team sees
- Inspection board — Inspections grouped by their current disposition and work state.
- Inspections awaiting review — Submitted cases ready for the Quality Reviewer to decide.
- Failed inspection checks — Requirement failures and evidence linked back to their inspections.
Follow the work through
See inspection review and corrective action.
What it keeps track of
Data model- Inspections
- Incoming, in-process, final and service inspections
- Inspection checks
- Individual requirement checks captured during an inspection
- Nonconformances
- Quality issues raised from failed inspection scope
- People
- Quality staff, inspectors and approvers
Who uses it
Permissions- Inspector
- Records checks and submits the inspection.
- Quality Reviewer
- Decides acceptance or rejection and starts follow-up for failed scope.
- Admin
- Sets access for the team.
Set up Medical Devices QMS your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.