- Inspection to nonconformance
Inspection to nonconformance
An inspection starts with a product, inspection type and date. The assigned inspector records results against specifications and cites observed defects. A failed or conditional outcome creates a linked nonconformance report once, so the issue can be contained without losing measurement evidence.
Step by step
-
Select the plan Quality Engineer
Quality Engineer chooses the effective plan for the item and stage. The inspector confirms the lot and resulting sample numbers.
- Establish inspection basis
- Updates Products, Inspection plans, Sample plans
-
Record the observations Inspector / QC Operator
Inspector / QC Operator enters measured values and defect instances against the source inspection.
- Preserve measured evidence
- Updates Inspections, Inspection results, Defect instances
-
Mark the outcome Inspector / QC Operator
The inspector records Fail or Conditional when the lot requires issue handling. The linked report carries the affected item and source.
- Link one issue to the inspection
- Updates Inspections, Non-conformance reports
-
Confirm severity Quality Manager
Quality Manager checks the worst cited defect and the resulting severity. Critical and major cases require root cause work.
- Set issue priority
- Updates Defects, NCR defects, Non-conformance reports
-
Contain the material Inspector / QC Operator
The team records what was affected, which action was applied and who applied it.
- Record immediate action
- Updates Containment, Non-conformance reports
Who does what
Roles and permissions- Quality Engineer
- Prepares plans.
- Inspector / QC Operator
- Records observations and containment.
- Quality Manager
- Checks severity and directs the next decision.