All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Regulatory Reporting
  2. Features
  3. Control Testing
Feature · Control Testing

Control Testing

Document samples, exceptions, results and evidence for each control test.

OverviewTests awaiting a result
Regulatory Reporting · Control Testing

Tests awaiting a result

Approval conditions

New
ParentControlControl codeSample sizeException countResult
Regulatory return readiness reviewClosed record retention enforcementCTL-SETTLE-01903Pending
2026 incident response assessmentReturn package independent reviewCTL-DISC-0254033Pending
Q3 payment controls assessmentClient file completeness checkCTL-VENDOR-0312029Pending
2026 incident response assessmentIncident notification escalationCTL-ACCESS-0460039Pending
2026 incident response assessmentVendor risk reviewCTL-INCIDENT-059037Pending
6 of 6 records
CTL-SETTLE-01Assessment tests · AT-45006
Pending
ParentRegulatory return readiness review
ControlClosed record retention enforcement
Sample size90
Exception count3
Example screen with sample data

What you can do

Record the work behind each result

A Control Tester records a test against an assessment and a specific control. The test has a tested date, sample size, exception count, result and evidence reference. Those details make a pass or fail reviewable. The reviewer can compare the recorded exceptions with the conclusion and ask for more evidence when the sample does not support it.

For example, a tester samples branch reconciliations for the current reporting period. If several selected items have exceptions, the tester records that count and the evidence reference alongside the result. A failed result can lead to a finding linked to the same control and assessment. An inconclusive result remains a real result: it tells the reviewer that the evidence has not established a pass or fail.

How the work is organized

  • Assessment link. Each test belongs to the period and scope recorded on its parent assessment.
  • Control link. The tested control identifies the underlying risk and accountable owner.
  • Evidence and outcome. Sample size, exceptions, result and evidence reference let a different person inspect the conclusion.

What to agree during setup

Agree what a sample represents for each control and how the tester should count exceptions. Decide what evidence reference format points to the underlying item, and when an attachment should be kept on the assessment. A reference that another reviewer cannot open or identify is weak support for a test conclusion.

Separate the person performing the test from the person making the independent assessment decision. The team should decide how to handle an incomplete sample and when to mark a test inconclusive. Set a convention for recording a failed test as a finding so the remediation owner can see the issue without interpreting test notes alone.

Check the handoff on an actual case

Take a planned assessment with an active linked control. Record a test date, sample and exception count, then add a result and evidence reference. Attach supporting material to the assessment where appropriate. Have the Independent Assurance Reviewer follow the test to its control and inspect whether the evidence supports the result. Repeat with an inconclusive result and ask the reviewer to identify what additional evidence would resolve it.

If the test fails, create a finding with a severity and description. Confirm that the finding points back to the same assessment and control. The remediation team should be able to read the issue and assign a corrective action without reconstructing the tester’s private notes.

What your team sees

  • Tests awaiting a result — Find test records still waiting for a conclusion.
  • Failed control tests — Review failures and inconclusive results with their sample details.
  • Assessment status board — See which assessments are still in testing.

Follow the work through

The scope and testing process takes the test through review. Follow findings and retests when a control needs corrective work.

What it keeps track of

Data model
Assessment tests
Individual control tests with sample size, exceptions and result.
Assessments
Control assessment engagements with period, scope and lifecycle.
Controls
Controls mitigating a risk, with owner and effective date.
Findings
Control testing findings with severity and remediation status.
Record attachments
Evidence files attached to an assessment.

Who uses it

Permissions
Control Tester
Documents sample-based tests and the evidence behind each result.
Control Owner
Defines assessment scope, owns controls and submits return packages.
Independent Assurance Reviewer
Makes assessment and return decisions and records independent retests.

Set up Regulatory Reporting your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appRegulatory Reporting

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.