1. Hazardous Materials SCM
  2. Who it's for
  3. Industrial site stores
Who it's for

Industrial site stores

An industrial site store handles controlled materials for operations at specific places. A request records where stock is needed and when. The storage location's eligibility note and a hazard check give the reviewer context for a decision. The operator then needs the lot's current state and expiry before using it.

How Hazardous Materials SCM is set up for you

Site ownership

Organizations and team members establish which site and people are responsible for a request.

Storage review

The reviewer sees the hazard class, SDS revision, maximum units and proposed location together.

Stock claim

An Active reservation distinguishes committed stock from free quantity without changing on-hand stock.

Traceable issue

A posted signed movement keeps the request, item, location and lot link.

An industrial site store handles controlled materials for operations at specific places. A request records where stock is needed and when. The storage location's eligibility note and a hazard check give the reviewer context for a decision. The operator then needs the lot's current state and expiry before using it.

Pick one site and its active locations. Have Admin check organization membership, location codes and the eligibility notes that reviewers will use. The coordinator opens one request for a named item and specific required date. The reviewer records an Approve or Reject decision with a reason. The operator tests a Released lot and a Blocked lot before reserving the approved scope.

Include a correction rehearsal. If the request remains Draft, cancel it before reserving stock. For an Approved request with an unused claim, release that claim once. If an issue has posted, retain the original movement and make a compensating entry linked through Reverses. Confirm the receipt reflects the actual effect. This keeps the site team from treating a status change as proof of physical movement.

Features to start with

Roles on the team

Hazardous Materials Full Access
Full record access for the hazardous materials SCM build and administration.
Inventory Coordinator
Prepares stock requests and hazard checks for review.
Inventory Reviewer
Makes an independent decision on inspected storage scope.
Stock Operator
Handles approved stock reservations and movement records.

Set up Hazardous Materials SCM your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started