Work Order Progress List
Which jobs are released, in progress or awaiting quality review, and how do their planned dates compare?
Answer operating questions about work progress, material consumption, scrap, station events and accepted output.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 48 | ||
| Released | 21 | 44% | |
| In progress | 5 | 24% | |
| Quality review | 1 | 20% |
Sample totals per stage
Which jobs are released, in progress or awaiting quality review, and how do their planned dates compare?
Which operator intervals share a station or work order and need a scheduling discussion?
What good and scrap quantities did operators report for each job?
How much on-hand quantity is already reserved for each item, lot and location?
Which produced lots still need a decision or remain Held?
Which station reasons account for unresolved events and longer completed interruptions?
Which purchased items still have an outstanding quantity against the supplier order?
Keep the report’s operating meaning clear. A production interval describes reported work; a Released batch describes an acceptance decision. Reconcile the job’s accepted output before treating it as complete. Review posted material separately from Draft and Reversed issues, and compare both on-hand and reserved stock when discussing shortages.
Elapsed production time comes from the interval’s start and end. It is useful for a floor review when those entries are maintained consistently. Andon resolution time applies to events with a resolution time; keep unresolved events visible as open questions rather than assigning them an invented duration.
Calculate elapsed time from the start and end of each production interval and review it beside the reported unit counts.
Group material issues by item, lot and work order, keeping Draft, Posted and Reversed quantities separate.