All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Smart Meter Data Platform
  2. Reports and Evidence Questions
Reference

Reports for the questions your team asks

Read interval outcomes and service position with quality, source identity and review context visible.

Overview
Smart Meter Data Platform · Overview

Smart Meter Data Platform dashboard

This quarter

Service cases in view
6
Total affected units
2,840
Reported
2
Triaged
2

Interval readings by status

How far records got this quarter

StageReachedStep
Draft29
Submitted1862%
Approved1267%
Rejected758%

Energy kWh by status

Sample totals per stage

9.0k0
6.0kDraft
8.0kSubmitted
9.0kApproved
5.0kRejected
8.0kCompleted
Example screen with sample data

Questions to answer

Interval Acceptance Position List

Which readings are waiting for review, approved or recorded as completed, and what quality designation do they retain?

Accepted Energy Review List

Which accepted value remains effective for each meter interval after reviewed corrections, with its quality designation intact?

Source Evidence Review List

What observation, unit and source reference support the work being reviewed?

Service Area Case Position Grouped

Which cases and affected scope belong to each service area, and who owns the response?

Restoration Timeline List

What reported and actual restoration times explain the case history?

Review Decision Trace Grouped

Who reviewed the identified source revision and what reason did they record?

Operation Result Review List

Which action results need reconciliation against their actual effects?

Reading the results

Keep estimated readings visibly distinct when reviewing accepted energy. Confirm the organization, meter identity and interval-end convention before comparing records, and retain the source quality flag. When a reviewed correction replaces an accepted estimate, select the effective result established by that correction for totals. Keep the earlier estimate visible as history and exclude it from the same total. Agree this selection before aggregating energy. Read measurements with their units; values from different units should not be combined without an explicitly configured interpretation.

A service-area total of affected units can include overlapping case scope. Inspect the actual cases before treating the total as a unique population. An accepted interval also does not establish that the surrounding service case is restored or closed.

Follow a decision through its operation identity and actual reviewed subject. Several intervals can share a parent case, so the case link alone does not identify the approved reading. Read outstanding receipts against the linked effects before accepting a completion result.

Set up Smart Meter Data Platform your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appSmart Meter Data Platform

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.