All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Aerospace Components CPQ
  2. Features
  3. Evidence and reconciliation
Feature · Evidence and reconciliation

Evidence and reconciliation

Quote attachments, operation receipts and checks of what each receipt claims.

OverviewOperation receipts needing attention
Aerospace Components CPQ · Evidence and reconciliation

Operation receipts needing attention

Operation receipts

New
Operation keyActionParentExpected revisionResult stateFailure reason
quote-submit-2026-0311Submit quote for reviewWing sensor housing proposal730PendingDrawing revision does not match line
price-review-2026-0312Approve pricing exceptionFlight actuator bracket quote70FailedMaterial certificate missing
quote-accept-2026-0313Send customer proposalCabin air duct revision quote20Needs reviewPrice book revision is inactive
order-handoff-2026-0314Record customer acceptanceFlight actuator bracket quote760PendingCustomer approval file is unreadable
revision-lock-2026-0315Create sales order handoffLanding gear spacer bid860FailedExport control review incomplete
6 of 6 records
quote-submit-2026-0311Operation receipts · OR-34657
Pending
ActionSubmit quote for review
ParentWing sensor housing proposal
Expected revision730
Failure reasonDrawing revision does not match line
Example screen with sample data

What you can do

Keep proof next to every quote

Aerospace quotes depend on documents: the customer’s request, drawings at a given part revision, certificate requirements, the acceptance itself. Record attachments hold these against the quote with a Title, the File, an evidence type, the uploaded by team member, uploaded at and a Visibility of Internal or Shared. Internal files stay with your team; Shared marks files that may go back to the customer.

Every guarded action on a quote leaves an operation receipts entry: pricing, review decisions, requirement decisions and handoff. A receipt records the operation key, the Action, the expected revision, the result state, occurred at, and where relevant an external reference, the effect references it changed and a failure reason. Result state is Pending, Completed, Failed or needs review.

How the work is organized

  • Receipts make retries safe. A stable operation key means a repeated request replays the original receipt. Nobody needs to guess whether a timed-out action ran.
  • Reconciliation reads before it writes. The reconciliation run takes Pending, Failed and needs review receipts in scope and compares each one with its parent quote, quote lines and review decisions. It marks a receipt Completed only with real evidence, or routes it to needs review with a concrete discrepancy. It never repeats the external action.
  • Typed references need confirmation. A typed external reference without confirmation from the provider is never enough to mark a receipt Completed.

What to agree during setup

Agree the evidence type values you use, such as customer request, drawing, certificate requirement and acceptance, and which of them may be Shared. Decide how often reconciliation runs on a schedule and who runs it on demand after an incident. Agree who works the needs review list, how quickly a Failed receipt must be explained, and when a receipt can be closed. Confirm how long evidence is kept, since corrections keep existing files and receipts in place.

Check the handoff on an actual case

Pick a quote that was priced, approved, accepted and handed off. Attach the customer request and the acceptance document. Run reconciliation while the handoff receipt is still Pending without an order connection and confirm it is not marked Completed. Type a made-up external reference into a test receipt and confirm reconciliation still refuses to complete it. Then break one priced line in a copy of the quote and confirm reconciliation routes the pricing receipt to needs review with the discrepancy named.

Ask the Pricing Reviewer to explain every exception on the list, and the Auditor to trace one receipt back to the quote and the decision it came from.

What your team sees

  • Operation receipts needing attention — Pending, Failed and needs review receipts with action, expected revision and failure reason.
  • Quote evidence files — attachments by quote with evidence type, visibility, uploader and upload date.

The Operations Overview page in the app shows persisted operation exceptions next to quote value and review demand.

Follow the work through

Review the reports your auditors will use.

What it keeps track of

Data model
Record attachments
Evidence files attached to a quote record.
Operation receipts
Durable receipts for guarded operations with stable operation keys.
Review decisions
Independent review decisions recorded against a quote revision.
Quotes
Aerospace component quote headers with lifecycle, revision and USD net amount.

Who uses it

Permissions
Pricing Reviewer
Reconciles operational evidence.
Auditor
Reads all receipts and files.
Quote Specialist
Files evidence on the quotes they own.

Set up Aerospace Components CPQ your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appCPQ for Aerospace Components

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.