All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. BOM Management
  2. Features
  3. Output quality
Feature · Output quality

Output quality

Keep reported production separate from the decision to release a Pending batch.

OverviewPending batch review
BOM Management · Output quality

Pending batch review

Approval conditions

New
IdWork orderLot numberProduced atExpiry dateDisposition
WO-2026-0412Build 40 pump assemblies for North PierL26-137814 Nov18 NovPending
BOM-REV-2026-018Form 80 left mounting bracketsL26-901514 Nov23 NovPending
PO-2026-0881Machine 120 stainless impellersL26-875006 Nov09 NovPending
BATCH-2026-103Build 40 pump assemblies for North PierL26-144705 Nov08 NovPending
MI-2026-0294Build 40 pump assemblies for North PierL26-951516 Nov20 NovPending
6 of 6 records
WO-2026-0412Batches · BTC-32543
Pending
Work orderBuild 40 pump assemblies for North Pier
Lot numberL26-1378
Produced at14 Nov
Expiry date18 Nov
Work order statusPlanned
Example screen with sample data

What you can do

Decide which output can be released

A production log describes work performed, including good and scrap output. Quality Reviewer makes the later decision about the batch. A batch identifies work order, lot number, production date and expiry date, with disposition Pending, Released, Held or Rejected. Work order status gives the reviewer context from the linked production record without treating the log as an inspection result.

The quality-release workflow accepts a Pending batch only when its work order has reached Quality review. It then sets disposition to Released once. A repeat request cannot provide another eligible Pending-to-Released transition. The team still needs an inspection routine that lets the reviewer decide whether the actual output meets its requirements before using that action.

How the work is organized

  • Pending output. Identify the batch and its work order before the reviewer acts. A lot number helps staff discuss the physical output, while production date and expiry date retain the recorded production and expiry context where the business uses them.
  • Human decision. Quality Reviewer checks the output and chooses whether to release an eligible Pending batch. Production Operator’s reported good units cannot substitute for this decision or grant the operator quality authority.
  • Exception disposition. Held and Rejected exist as disposition choices. Agree who may choose these outcomes and who decides the next treatment for the affected output before go-live.

What to agree during setup

Agree what inspection evidence the reviewer needs and where it lives. Use the inspection source your team relies on for measurements and certificates. Ask the reviewer to explain how the reported output relates to the physical lot being inspected. Keep the release decision focused on that lot and its actual evidence.

Configure the release action for Quality Reviewer and test direct access as well as the screen. Decide who may assign Held or Rejected and who resolves the resulting work. Completing work orders is a separate controlled update after the team checks the remaining obligations; releasing a batch does not automatically mark its work order Completed.

Check the handoff on an actual case

Create a demonstration batch linked to running work and leave its disposition Pending. Try to release it while work order status is In progress. The quality guard should reject the action because the work has not reached Quality review. Submit a valid production interval through the production workflow and verify that the work order enters the required state.

Ask Quality Reviewer to inspect the demonstration output using the agreed evidence source and release the eligible batch. Repeat the release request and verify that the original batch remains Released without another successful decision. Include a batch the reviewer would hold and explain the exception action instead of sending it through the accepted-output path. Finally, check whether the planner can still see outstanding work on the work order and decide completion separately.

What your team sees

  • Pending batch review — Pending lots with the linked work state visible.
  • Production schedule — Released, running and quality-review work with planned dates.

Follow the work through

Follow production to quality release. Check reports for disposition and reported-output questions and integrations for an external inspection source.

What it keeps track of

Data model
Batches
Production batches and their quality disposition.
Work orders
Production work orders released against orders and resources.
Production logs
Shop-floor production intervals with good and scrap output.
People
People records for BOM Management.

Who uses it

Permissions
Quality Reviewer
Decides accepted output, Production Planner checks work completion separately and Production Operator explains the reported interval.
Production Planner
Owns production setup, planning and assigned operational work.
Production Operator
Captures assigned production work and evidence.
Admin
Maintains the agreed access.

Set up BOM Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appBOM Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.