All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Architecture Firms CRM
  2. Features
  3. Design RFPs
Feature · Design RFPs

Design RFPs

Prepare design proposal submissions with a revision, due date and traceable review.

OverviewDraft design RFPs
Architecture Firms CRM · Design RFPs

Draft design RFPs

Submission waits for the proposal coordinator

New
IdStatusRevisionSubmission dueSite addressParent
RFP-2026-041Draft85017 NovBriar House, 18 Orchard StreetBriar House adaptive reuse
ACT-2026-042Draft39008 NovNorth Pier library, 42 Wharf RoadHighbank School science wing
REV-2026-043Draft20010 NovCedar Court, 6 Grove AvenueHarbor Market public realm design
OPR-2026-044Draft36012 NovMason Works, 271 Foundry LaneCedar Court mixed-use design
ATT-2026-045Draft14014 NovWillow Clinic, 33 Elm StreetCedar Court mixed-use design
6 of 6 records
RFP-2026-041Design RFPs · DR-32783
Draft
Revision850
Submission due17 Nov
Site addressBriar House, 18 Orchard Street
ParentBriar House adaptive reuse
Example screen with sample data

What you can do

Keep proposal work tied to its pursuit

A design RFP belongs to an opportunity and a practice organization. The proposal coordinator can record the site address, submission due date, estimated area and project budget as the bid takes shape. These values help the team judge the commission in context without creating a separate pipeline record. The RFP’s revision and status show whether the submission is still in draft, has been submitted, or has reached a later decision state.

Submission is a controlled operation. It checks that the RFP is Draft and that its revision matches the version the coordinator inspected. On success, the submission freezes that revision and writes an operation receipt. If another person changed the proposal in the meantime, the coordinator must review the current record before trying again. This is useful when the proposal package and budget are changing near a deadline.

How the work is organized

  • Pursuit link. Every design RFP points back to the fee opportunity that prompted it.
  • Submission version. Revision and status keep the submitted proposal distinct from the draft the team was editing.
  • Review trail. A review decision captures the source revision, reviewer, decision date and reason.

What to agree during setup

Agree who prepares the proposal, who confirms the submission package and who records the independent review. Decide how the practice identifies a revised proposal after submission. Agree whether the site address and project budget come from the client request or the practice’s bid assumptions. Identify where the team keeps the actual delivered package and how it will link its file evidence to the opportunity. Practice one last-minute change while a coordinator has the prior revision open.

Check the handoff on an actual case

A library commission moves into proposal work. The coordinator creates a design RFP under the opportunity, records the site address and submission due date, and adds the project budget. An attachment holds the current proposal document on the parent pursuit. The coordinator reviews the RFP’s revision, submits it and checks the operation receipt. The practice reviewer then records a reasoned decision with the source revision identified on the parent pursuit.

If the reviewer returns the proposal, the reason points the coordinator to the work that needs attention. If a colleague had edited the draft just before submission, the revision check prevents the coordinator from treating the older version as the submitted one. The principal can read the RFP decision beside the customer pursuit, while keeping the internal review separate from a Won or Lost customer outcome.

What your team sees

  • Draft design RFPs — Proposal submissions still being prepared and their due dates.
  • Submitted design RFPs — Submissions ready for a reviewer to inspect.
  • Design RFP decision queue — Submitted and decided proposal records with their parent pursuits.

Follow the work through

Design RFP submission follows the draft through submission. Proposal review and evidence shows the review handoff.

What it keeps track of

Data model
Design RFPs
Design proposal submissions and their review lifecycle
Opportunities
Business development opportunities and fee pursuits
Review decisions
Independent review outcomes recorded against a source revision
Record attachments
Files and evidence attached to an opportunity
Operation receipts
Stable operation evidence for workflow executions

Who uses it

Permissions
Proposal Coordinator
Prepares and submits design RFPs.
Practice Reviewer
Records an independent decision.
Practice Principal
Checks the proposal’s place in the wider pursuit.

Set up Architecture Firms CRM your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appCRM for Architecture Firms

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.