All applications611

Find your application

611 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Rubber ERP
  2. Features
  3. Assembly and kitting
Feature · Assembly and kitting

Assembly and kitting

Assembly and kitting connects a product's component quantities, ordered operations and standard cost to actual work. A distributor may combine stocked items into a kit or repack an item before delivery. The work order controls how much output is intended and which material and cost sources may be consumed.

OverviewProduction schedule
Rubber ERP · Assembly and kitting

Production schedule

Work orders

New
Work order numberOutput productPlanned startPlanned endStatusManager
WO-63134PRD-905021 Oct25 OctReleased
WO-77111PRD-127707 Oct10 OctIn progress
WO-52166PRD-500510 Oct14 OctPartially completed
WO-58888PRD-679421 Oct27 OctReleased
WO-86723PRD-598315 Oct23 OctIn progress
6 of 6 records
PRD-9050Work orders · WO-63134
Released
Planned start21 Oct
Planned end25 Oct
Example screen with sample data

What you can do

How the work is organized

  • Instructions. A bill of materials identifies component requirements for the output product. A routing provides ordered operations and declared labor or overhead basis.
  • Execution. Warehouse Manager releases a reviewed work order. Warehouse Operator records material issues and actual operation time, good quantity and scrap.
  • Completion. Accepted terminal output becomes stock once, with actual work-in-progress cost allocated to the completed quantity and variance made visible.

A draft recipe or changed standard should not silently alter a released order. Its frozen basis allows the team to compare planned inputs with what was actually issued and returned. Intermediate operation quantities are progress evidence; they are not additional finished units.

What to agree during setup

Decide which products are stocked finished items and which are kits or repacked outputs. Review product units, component quantities, routing order and the standard cost version. Assign a warehouse location for material issue and accepted output. Name the Warehouse Manager responsible for release and the Finance Manager for cost and variance decisions.

Agree how staff record operation starts and ends and how scrap is classified. Record actual labor hours and overhead basis only when the work genuinely uses them. The financial posting profile must point material, work in progress, output and variance to the appropriate entity accounts.

Check the handoff on an actual case

Create a work order to assemble a dealer’s kit from stocked components. Verify the component reservation uses the correct entity and available position. Warehouse Manager reviews the frozen bill, routing, output product and positive planned quantity before release. Warehouse Operator issues only bounded component quantities, records an operation entry and notes any scrap.

Complete part of the output. The completion should take an eligible terminal entry and allocate only the actual work-in-progress scope behind that accepted quantity. Confirm the output enters the intended location, its standard value is recorded and any variance stays visible. Close only after remaining material, cost and output scope have been reconciled. If a recorded entry needs correction, retain the original and a linked correction rather than replacing the historical event.

What your team sees

  • Production schedule — Released and active work orders by output, planned window and manager.
  • Warehouse availability — Inputs available for reservation and completed output after posting.
  • Period close work — Reconciliation tasks that include unresolved production balances.

Follow the work through

What it keeps track of

Data model
Bill of materials
BOM header — the recipe for producing a given product.
BOM components
Each raw or sub-assembly consumed to build the parent product.
Routings
Routing header — the sequence of operations required to build a product.
Routing operations
Ordered work instructions and declared labour/overhead bases.
Work orders
Released bounded assembly/kitting/repacking, without plant APS or payroll scope.
Work order components
Exploded BOM demand for a work order — what raw material is needed and from where.
Work order operations
Frozen instructions and assigned actual work.
Production log
Shop-floor time and quantity transactions against a work-order operation.
Production completions
Accepted terminal output and WIP cost allocation, once per actual completed scope.
Work order cost entries
Immutable WIP debit/credit sources and bounded actual-cost allocation.
Cost standards
The standard cost of an item by element — material, labour, overhead and outside processing — pending or current, activated on a date.

Who uses it

Permissions
Warehouse Manager
Releases work and confirms eligible output.
Warehouse Operator
Records actual material and operation work.
Finance Manager
Reviews standards and required variances.
Accountant
Reconciles work in progress.
Purchasing Manager
Follows input supply.
Admin
Maintains reviewed configuration.

Set up Rubber ERP your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started