Connects to the tools you use
Set up connections through ERP.AI and Proto workflows, with every change logged.
- Construction GRC
- Permit authority or register
- Document repository
- Identity service
- Report sharing
GRC for Construction organizes site checks, scoped assessments and evidence-based testing of controls tied to business-unit risks. An assessment owner sets the period, scope and planned controls.
Approval conditions
| Id | Site | Inspected at | Permit reference | Open safety issues | Status | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | North viaduct site | 05 Nov | HW-2026-118 | 640 | Submitted | |
| FND-2026-018 | East tower site | 14 Nov | EXC-2026-044 | 280 | Submitted | |
| ACT-2026-063 | Riverside excavation | 07 Nov | LIFT-2026-026 | 510 | Submitted | |
| TEST-2026-117 | West campus build | 14 Nov | CSE-2026-013 | 740 | Submitted | |
| DOC-2026-022 | Harbor tunnel portal | 05 Nov | ENV-2026-008 | 700 | Submitted |
The Independent Reviewer records a passing retest before the finding closes and the corrective action is verified.
Every feature works on the same records. Pick one to see the screen your team works in.
Keep inspected sites, permit references and open safety issues in a reviewable record.
Assessments
| Record number | Subject | Period start | Period end | Status | Owner | |
|---|---|---|---|---|---|---|
| ASS-44261 | North viaduct safety assessment | 25 Nov | 27 Nov | Planned | Devon Reyes | |
| ASS-76466 | East tower permit review | 27 Nov | 01 Dec | Testing | Kavita Brooks | |
| ASS-13735 | Riverside excavation audit | 09 Nov | 16 Nov | Review | Luis Mensah | |
| ASS-17453 | Warehouse fit-out compliance review | 22 Nov | 24 Nov | Planned | Kavita Brooks | |
| ASS-38972 | West campus scaffold inspection | 11 Nov | 17 Nov | Testing | Andre Sato |
Define the assessment period, responsible owner and controls to test.
Assessments
| Record number | Subject | Status | Period start | Period end | Owner | |
|---|---|---|---|---|---|---|
| ASS-99641 | North viaduct safety assessment | Draft | 19 Nov | 26 Nov | Andre Sato | |
| ASS-65409 | East tower permit review | Planned | 28 Nov | 02 Dec | Mara Iqbal | |
| ASS-35408 | Riverside excavation audit | Testing | 29 Nov | 08 Dec | Andre Sato | |
| ASS-46874 | Warehouse fit-out compliance review | Review | 18 Nov | 27 Nov | Omar Chen | |
| ASS-52410 | West campus scaffold inspection | Approved | 26 Nov | 04 Dec | Theo Haddad |
Tie business-unit risks to effective controls and named owners.
Controls
| Id | Control code | Risk | Owner | Effective from | Status | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | SITE-EXC-01 | Defective concrete from missed hold point | Theo Haddad | 18 Nov | Active | |
| FND-2026-018 | SITE-HW-02 | Defective concrete from missed hold point | Devon Reyes | 24 Nov | Active | |
| ACT-2026-063 | SITE-SCF-03 | Fall from untagged scaffold | Omar Chen | 17 Nov | Active | |
| TEST-2026-117 | SITE-LIFT-04 | Unprotected excavation collapse | Theo Haddad | 10 Nov | Active | |
| DOC-2026-022 | SITE-CSE-05 | Defective concrete from missed hold point | Andre Sato | 07 Nov | Active |
Record sample size, exceptions, results and evidence for scoped tests.
Assessment tests
| Id | Parent | Control | Sample size | Exception count | Result | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | North viaduct safety assessment | Weekly scaffold tag inspection | 600 | 40 | Fail | |
| FND-2026-018 | East tower permit review | Subcontractor induction check | 810 | 31 | Fail | |
| ACT-2026-063 | Harbor tunnel contractor audit | Daily excavation shoring check | 420 | 35 | Fail | |
| TEST-2026-117 | West campus scaffold inspection | Concrete pour hold-point sign-off | 540 | 16 | Fail | |
| DOC-2026-022 | Riverside excavation audit | Crane lift plan approval | 640 | 23 | Fail |
Turn failed tests into owned correction work with due dates and evidence.
Verified waits for the independent reviewer
| Id | Finding | Owner | Due at | Status | Evidence | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | Subcontractor induction incomplete | Lina Okafor | 09 Nov | Submitted | Scaffold tag photo | |
| FND-2026-018 | Trench edge lacks required barrier | Sienna Farouk | 29 Nov | Submitted | Signed hot work permit | |
| ACT-2026-063 | Hot work permit expired on shift | Omar Chen | 05 Nov | Submitted | Excavation inspection log | |
| TEST-2026-117 | Trench edge lacks required barrier | Kavita Brooks | 11 Nov | Submitted | Lift plan approval sheet | |
| DOC-2026-022 | Confined space log lacks gas reading | Sienna Farouk | 05 Nov | Submitted | Gas monitor reading log |
Require a separate reviewer to verify correction before closure.
Retests
| Id | Finding | Reviewer | Tested at | Result | Evidence | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | Pour inspection signed after release | Mara Iqbal | 27 Nov | Pass | Scaffold tag photo | |
| FND-2026-018 | Hot work permit expired on shift | Luis Mensah | 15 Nov | Fail | Signed hot work permit | |
| ACT-2026-063 | Sediment fence damaged by runoff | Kavita Brooks | 09 Nov | Inconclusive | Excavation inspection log | |
| TEST-2026-117 | Pour inspection signed after release | Andre Sato | 29 Nov | Pass | Lift plan approval sheet | |
| DOC-2026-022 | Confined space log lacks gas reading | Theo Haddad | 14 Nov | Fail | Gas monitor reading log |
Keep assessment attachments and controlled document versions available for review.
Documents
| Id | Number | Name | Uploaded date | Version number | Status | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | DCM-25688 | East tower hot work procedure | 11 Nov | 540 | Published | |
| FND-2026-018 | DCM-11142 | North viaduct lift plan | 12 Nov | 90 | Published | |
| ACT-2026-063 | DCM-50395 | Riverside excavation permit | 16 Nov | 510 | Published | |
| TEST-2026-117 | DCM-92347 | West campus scaffold register | 25 Nov | 470 | Published | |
| DOC-2026-022 | DCM-19459 | Subcontractor induction handbook | 22 Nov | 760 | Published |
Control test to verified correction ships ready to use. One step needs a named approval before the work moves on: Independent retest (Independent Reviewer).
Set the period, organization, owner and scope.
Create test lines for the controls in scope.
Record samples, exceptions, results and evidence.
Open a finding from a failed or inconclusive test.
Name the correction owner, due date and evidence.
A separate reviewer records the result that decides closure.
Open any site compliance check to see the roles that work on it, its process stages and its approvals on one page.
Site, Inspected at, Permit reference and Open safety issues.
Records linked to this site compliance check.
Admin, Compliance Manager and Site Inspector, each with their own permissions.
Register site check, with the role that acts.
Independent retest, with who decides.
North viaduct site · Submitted
Assessment files carry an internal or shared visibility choice. Agree who may view each category before loading sensitive material.
Signed in as Independent Reviewer
| Decision | Approver | |
|---|---|---|
| Independent retestA separate reviewer records the result that decides closure. | Independent Reviewer |
Everyone opens Construction GRC to the work that is theirs. Pick a role to see what it starts with.
Maintains organization, people and access settings for the compliance workspace.
Oversees site checks, assessment scope and exceptions across the organization.
This is the first screen this role sees.
Assessments · Compliance Manager
| Record number | Subject | Period start | Period end | Owner | Status | |
|---|---|---|---|---|---|---|
| ASS-83501 | North viaduct safety assessment | 26 Nov | 02 Dec | Sienna Farouk | Planned | |
| ASS-32074 | East tower permit review | 10 Nov | 18 Nov | Devon Reyes | Testing | |
| ASS-87980 | Riverside excavation audit | 13 Nov | 17 Nov | Kavita Brooks | Review | |
| ASS-45456 | Warehouse fit-out compliance review | 25 Nov | 29 Nov | Devon Reyes | Planned | |
| ASS-14318 | West campus scaffold inspection | 15 Nov | 18 Nov | Sienna Farouk | Testing |
Scopes assessments, plans tests and follows findings through correction.
This is the first screen this role sees.
Assessments · Assessment Owner
| Record number | Subject | Period start | Period end | Owner | Status | |
|---|---|---|---|---|---|---|
| ASS-83501 | North viaduct safety assessment | 26 Nov | 02 Dec | Sienna Farouk | Planned | |
| ASS-32074 | East tower permit review | 10 Nov | 18 Nov | Devon Reyes | Testing | |
| ASS-87980 | Riverside excavation audit | 13 Nov | 17 Nov | Kavita Brooks | Review | |
| ASS-45456 | Warehouse fit-out compliance review | 25 Nov | 29 Nov | Devon Reyes | Planned | |
| ASS-14318 | West campus scaffold inspection | 15 Nov | 18 Nov | Sienna Farouk | Testing |
Records inspected sites, permit references and open safety issues.
This is the first screen this role sees.
Site compliance checks · Site Inspector
Maintains the control and supplies evidence for its assessment tests.
This is the first screen this role sees.
Controls · Control Owner
| Id | Control code | Risk | Owner | Effective from | Status | |
|---|---|---|---|---|---|---|
| SITE-2026-041 | SITE-EXC-01 | Defective concrete from missed hold point | Theo Haddad | 18 Nov | Active | |
| FND-2026-018 | SITE-HW-02 | Defective concrete from missed hold point | Devon Reyes | 24 Nov | Active | |
| ACT-2026-063 | SITE-SCF-03 | Fall from untagged scaffold | Omar Chen | 17 Nov | Active | |
| TEST-2026-117 | SITE-LIFT-04 | Unprotected excavation collapse | Theo Haddad | 10 Nov | Active | |
| DOC-2026-022 | SITE-CSE-05 | Defective concrete from missed hold point | Andre Sato | 07 Nov | Active |
Owns corrective action plans and submits evidence of completed work.
This is the first screen this role sees.
Findings · Finding Owner
Retests corrected findings and records the independent closure decision.
This is the first screen this role sees.
Findings · Independent Reviewer
Read assessment progress, testing exceptions and correction outcomes.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Draft | 37 | ||
| Submitted | 27 | 73% | |
| Approved | 16 | 59% | |
| Rejected | 9 | 56% |
Sample totals per stage
Group assessments by status, period and owner to find work awaiting testing or review.
Compare pass, fail and inconclusive results by assessment and control.
Compare sample size and exception count for tests with recorded evidence references.
Group findings by severity, status, assessment and control.
Show actions by owner, due date and status for follow-up.
Compare retest outcomes by reviewer, tested date and finding.
Show inspected sites, permit references and open safety issues by organization and status.
Show failed or review-needed operation receipts by action and occurrence date.
See how Construction GRC fits your kind of team.
Each stage of control test to verified correction names the role that acts and the status it records, so a change is never anonymous.
Each stage, the role that acts and the status it records
Ask Proto to prepare construction compliance work for owner review.
Set up connections through ERP.AI and Proto workflows, with every change logged.
Every record lives in a table you can see, extend and export. Add fields or whole tables in Proto.
Browse all 22 tablesStart with one team and one process, then add the rest once the basics are running.
Identify the organization, business units, active team members and construction sites for the pilot. Agree assessment periods and who owns them.
Record risks, likelihood and impact scales, active controls, effective dates and control owners. Select controls for the first assessment.
Assign roles, check internal and shared attachment access, and agree evidence references, document classification and retention rules.
Record a site check, scope an assessment, execute a failed test, register a finding, submit a corrective action and complete an independent retest.
Try an oversized exception count, a pass without evidence, a finding from a passing test, an owner’s attempted self-retest and a repeated operation key. Confirm the refusal or preserved result.
$0per user
The base account and everyday work in the ERP.AI app are free, for every user.
| Usage | Per $1 |
|---|---|
| Record reads (list, filter, get) | 20,000 |
| Search or aggregate queries | 4,000 |
| Record writes | 4,000 |
| Imported or synced records | 200,000 |
| Workflow runs | 2,000 |
| AI agent runs | 2,000 |
| Scheduled jobs or webhooks | 20,000 |
| File uploads (MB) | 2,000 |
| CSV or PDF exports | 100 |
Click Get started, then use Proto to configure GRC for Construction for your business. Begin with one organization, one site, one assessment period and a control that can be tested with evidence. Rehearse a failed test through correction and independent retest before adding more work.
Name a Team Member who belongs to the assessment organization and can coordinate the scope, planned tests and follow-up. The scoping workflow checks the owner’s membership and the assessment revision.
A Site Inspector records the site, inspected date, permit reference and open safety issues. The check can be submitted for a Compliance Manager’s review and kept with the relevant assessment context.
The tester records a tested date, sample size, exception count and evidence reference. The testing workflow refuses a passing result without an evidence reference and an exception count above the sample size.
A failed or inconclusive test can be the source of a finding tied to its assessment and control. A passing or pending test cannot create one through the finding workflow.
No. The owner may plan, carry out and submit the corrective action with evidence. A different reviewer records the retest. Only a passing independent retest closes the finding and verifies the action.
The finding stays open. The correction owner can address the remaining issue and submit further evidence for another independent check. The failed retest remains a dated record of the decision.
An assessment attachment is linked to its assessment with an uploader and visibility choice. A controlled document has versions under the parent document, so reviewers can examine the sequence and source reference.
Operations Overview includes failed operations in its exception queue. Review the related attempt, run or receipt and reconcile the outcome before repeating the request.
Start free, then use Proto to change fields, steps and approvals before your team goes live.