All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Construction GRC
  2. Features
  3. Evidence and documents
Feature · Evidence and documents

Evidence and documents

Keep assessment attachments and controlled document versions available for review.

OverviewPublished documents
Construction GRC · Evidence and documents

Published documents

Documents

New
IdNumberNameUploaded dateVersion numberStatus
SITE-2026-041DCM-25688East tower hot work procedure11 Nov540Published
FND-2026-018DCM-11142North viaduct lift plan12 Nov90Published
ACT-2026-063DCM-50395Riverside excavation permit16 Nov510Published
TEST-2026-117DCM-92347West campus scaffold register25 Nov470Published
DOC-2026-022DCM-19459Subcontractor induction handbook22 Nov760Published
6 of 6 records
SITE-2026-041Documents · DCM-25688
Published
NameEast tower hot work procedure
Uploaded date11 Nov
Version number540
Retention until20 Nov
Example screen with sample data

What you can do

Keep the supporting record close to the assessment

Assessment attachments have a title, file, upload date, evidence type, visibility choice and named uploader. Internal and shared visibility give the team a way to distinguish working evidence from material intended for broader review. A reviewer should be able to follow an assessment to its attachments without treating a file name alone as proof that the tested control passed.

Controlled documents have a number, name, upload date and status, with versions recorded separately. A document version retains a sequence, description, observation date, outcome and source reference when those details apply. The document record also carries classification, retention and access policy information. Those attributes support review of the document trail while the team agrees its operating rules.

How the work is organized

  • Visibility. Agree which assessment evidence is internal and which may be shared.
  • Versioning. Use a stable document number and decide when a new version is required.
  • Retention. Set classification, access policy and retention dates for the documents in scope.

What to agree during setup

The Assessment Owner and Compliance Manager should rehearse how this work is assigned and reviewed. Agree which organization and business unit own the first case, who may update it, and where its supporting evidence lives. Set a clear handoff when the person preparing the record is different from the person checking its outcome. Use the same rule for routine work and exceptions so an urgent item does not lose its owner or history.

For the pilot, choose an assessment attachment whose audience should be internal and another that may be shared. Confirm the uploader, date and evidence type on both. Choose a controlled document with an earlier version so reviewers can compare the source reference and status of the version they use.

Check the handoff on an actual case

Attach a piece of test evidence to an assessment and choose its visibility. Confirm that the uploader and date are retained. Create a controlled document and a subsequent version, then compare the version sequence and source reference. Compare the document’s recorded status with the version and source reference before relying on it. Keep the earlier version available when a later version is published. Check the operations overview if a related document operation fails, so the team investigates the failed attempt rather than assuming that publication succeeded.

Open Published documents to compare its current status, version number and retention date. Then return to the assessment to confirm its attachment has the intended visibility and uploader. A failed document attempt needs inspection of its recorded reason before anyone relies on the intended result.

What your team sees

  • Published documents — Controlled documents available in their published state.
  • My assessments — Assessment context for locating its evidence.

Follow the work through

See the related process for the stage-by-stage handoff. Use the data model to inspect the record relationships and implementation to plan the first rehearsal.

What it keeps track of

Data model
Record attachments
Evidence files attached to an assessment with a visibility scope.
Documents
Controlled documents with status, classification and retention.
Document versions
Immutable versions recorded against a parent document.
Execution attempts
Attempt-level execution records for document operations.
Operation runs
Durable operation runs for upload, approval and correction workflows.
Operation steps
Numbered step trace retained for each operation run.

Who uses it

Permissions
Assessment Owner
Scopes assessments, plans tests and follows findings through correction.
Compliance Manager
Oversees site checks, assessment scope and exceptions across the organization.
Admin
Maintains organization, people and access settings for the compliance workspace.

Set up Construction GRC your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appGRC for Construction

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.