Feature · Assembly costing

Assembly costing

A work order connects the released assembly plan to actual material and output cost.

OverviewActive stock positions
Inventory Valuation System · Assembly costing

Active stock positions

Inventory positions

New
ProductWarehouseLocationLot numberCustody stateQuantity on hand
SI-5351SL-110LCT-110L26-7601Available440
SI-4804SL-130LCT-130L26-5702Held920
SI-7232SL-150LCT-110L26-6201Picked890
SI-1470SL-110LCT-130L26-7476Transit890
SI-8230SL-110LCT-110L26-0292Production50
6 of 6 records
SI-5351Inventory positions · IP-12910
Available
WarehouseSL-110
LocationLCT-110
Lot numberL26-7601
Quantity on hand440
Reserved quantity810
Example screen with sample data

What you can do

Assembly costing in practice

A work order connects the released assembly plan to actual material and output cost. The frozen bill of materials, routing, output product and standard form the release basis. Material issues and production entries then contribute work in progress. Completion allocates actual work in progress to accepted output and exposes variance against standard output value.

How the work is organized

  • Release. Approve the bounded planned quantity and the frozen recipe.
  • Consumption. Trace actual material and operation entries to the work order.
  • Output. Allocate actual cost to the accepted completion and its new stock layer.

What to agree during setup

Warehouse Manager should agree who confirms material issue and terminal output. Finance Manager should decide how residual variance is reviewed before closing work. Check that the output standard is effective for the entity and product. A changed bill of materials should create a new version rather than rewriting a released order.

Check the handoff on an actual case

Take a kit with one accepted input layer and a positive planned output quantity. Release its work order against the approved recipe. Record a partial material issue, then a terminal production entry and completion for only the supported output. Compare allocated actual work in progress, standard output value and variance. If a residual variance remains, close requires the independent decision described by the production close rule.

What your team sees

  • Active stock positions — See the accepted output enter owned custody.
  • Open cost layers — Trace the new output layer and its remaining value.

The costing discussion should include partial work. A released order can have material issued before any output is accepted, leaving value in work in progress. When a completion posts, the terminal entry, confirmed quantity and allocated actual cost should agree. The standard output amount provides a comparison, while the variance remains visible for review. If the team closes the order later, Finance Manager can see what actual cost was allocated and what residual remains. This prevents a recipe change or a second completion from silently changing the original source basis.

A useful exception case is a component return after partial completion. Warehouse Operator records the returned material against the same work order, and Accountant checks that its work-in-progress credit is tied to the original issue. Warehouse Manager then compares the remaining material requirement with the output still planned. When the next completion is accepted, the output quantity and allocated actual cost must remain within the unconsumed work-order scope. This lets Finance Manager review the residual variance against the work that actually happened.

Follow the work through

Follow the related process and check the data model when mapping your source records. During rehearsal, compare the source document, the decision and the resulting value effect. Keep the accountable person visible at each handoff.

What it keeps track of

Data model
Work orders
Released bounded assembly/kitting/repacking, without plant APS or payroll scope.
BO ms
Effective distribution assembly/repacking recipes with explicit output basis.
BOM lines
Component quantities per explicit output basis, preserving dimensions and allowed loss.
Work order materials
Frozen required input and actual traced issue/return scope.
Production entries
Actual operation throughput, scrap and labour evidence; intermediate counts do not sum to output.
Production completions
Accepted terminal output and WIP cost allocation, once per actual completed scope.
Work order cost entries
Immutable WIP debit/credit sources and bounded actual-cost allocation.
Standard costs
Entity/product standard per base unit with immutable effective versions.
Stock layers
Remaining quantity/carrying value with receipt/output/return lineage.

Who uses it

Permissions
Warehouse Manager
Controls release and production scope.
Warehouse Operator
Records physical facts.
Finance Manager
Reviews value and close exceptions.

Set up Inventory Valuation System your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started