Which artwork is awaiting review?
Use Artwork by Market and Status to distinguish a draft from an approved or obsolete revision for the same SKU.
Review artwork, inspection outcomes and corrective work using the records that support each decision.
This quarter
How far records got this quarter
| Stage | Reached | Step | |
|---|---|---|---|
| Planned | 33 | ||
| In progress | 19 | 58% | |
| Review | 12 | 63% | |
| Accepted | 7 | 58% |
Sample counts per stage
Use Artwork by Market and Status to distinguish a draft from an approved or obsolete revision for the same SKU.
Label Check Results keeps the check type and evidence with the artwork it examined.
Inspection Workload and Outcomes shows the inspection state alongside assignment and timing.
Nonconformance and Action Progress exposes the linked actions and their current review state.
Audit Finding Follow-up keeps due dates and closure dates visible together.
Document Acknowledgment History follows the acknowledgment to its exact document revision.
Group artwork revisions by SKU, Market and Status to locate revisions awaiting review.
Group label check results by Artwork and check type, retaining reviewed by and Evidence for investigation.
Compare inspection Status by inspection type and assigned to with scheduled at and completed at.
Show requirements and their Result beneath each Inspection, keeping Pass, Fail and not applicable distinct.
Show each nonconformance with linked corrective action Status, Owner, due date and completed at.
Group findings by Audit with Severity, Owner, due date and closed at so completed findings remain distinguishable from outstanding work.
Review document Title, Version, effective date and Status without treating a newer draft as approved.
List acknowledgment dates and people under the exact linked controlled document revision; recorded acknowledgments do not establish a required training population.
Start free, then use Proto to change fields, steps and approvals before your team goes live.