All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Power Plant Operations
  2. Features
  3. Generating units
Feature · Generating units

Generating units

Keep unit capacity, fuel type and operating state attached to a plant event.

OverviewGeneration Interval Timeline
Power Plant Operations · Generating units

Generation Interval Timeline

Generation intervals

New
IdStarts atEnds atEnergy MWhFuel quantityFuel unit
GEN-2026-041206 Nov10 Nov270490million British thermal units
MNT-2026-019815 Nov20 Nov690870therms
EVT-2026-007417 Nov22 Nov730230gallons
SITE-01612 Nov16 Nov120560liters
MTR-028413 Nov18 Nov290660tonnes
6 of 6 records
GEN-2026-0412Generation intervals · GI-42585
Starts at06 Nov
Ends at10 Nov
Energy MWh270
Fuel quantity490
Fuel unitmillion British thermal units
Example screen with sample data

What you can do

Generating units in daily work

A generating unit has a name, rated output and fuel type. Its state moves among Operating, Standby, Maintenance and Outage. The unit is attached to an operational event, so the team can read the operating context with the unit rather than relying on a separate note. Generation intervals then refer to the unit for output and fuel reporting. This gives the plant team a clear way to distinguish a unit register from time-based production observations.

Plant Operators should use a stable unit name across shifts. Rated capacity is a reference value for checking an entry, not a substitute for measured generation. Fuel type identifies the kind of input; the quantity and unit for each time interval live with the interval. Operations Managers can review units by state when an event interrupts production or a planned maintenance window changes availability.

How the work is organized

  • Unit register. Keep the name, rated output and fuel type with the selected operating event.
  • State review. Read Operating, Standby, Maintenance and Outage on the unit board before changing availability.
  • Production context. Open the unit’s generation intervals when a manager asks why output changed.

What to agree during setup

  • Unit identity. Agree the naming convention and check that rated capacity and fuel type describe the equipment actually in service.
  • Event association. Select the operational record that explains the unit entry and confirm that it belongs to the intended site.
  • State changes. Decide who records the unit state and how the shift team confirms a transition into maintenance or outage.

Check the handoff on an actual case

A plant operator sees a unit move from Operating to Standby during a site event. They identify the operational event, update the unit state and record the later generation interval against the same unit. The manager can then compare its interval output with the time of the event. If a second unit has the same fuel type, its interval remains separate because each interval refers to one unit. The event association provides the site context when staff investigate why output changed. Before recording the next state, the Plant Operator checks the current state and the selected event together. A move from Operating to Standby can precede Maintenance or Outage in the planned operating path. The Operations Manager should ask for the event’s actual start time when comparing a state change with the interval, because an entry made after the shift can otherwise appear to explain an earlier output change.

What your team sees

  • Generating Units Board — Units grouped by their present operating state.
  • Generation Interval Timeline — Output periods linked to the selected unit.

Follow the work through

See the related operating process and data model when agreeing who records each step.

What it keeps track of

Data model
Generating units
Generating units attached to an operational record, with rated capacity and fuel type.
Operational events
Outages, maintenance, alarms and curtailments with response and recovery.
Generation intervals
Generation output and fuel consumption intervals for a generating unit.

Who uses it

Permissions
Plant Operator
Records unit operating state, generation intervals, meter readings and operational events at the plant.
Operations Manager
Owns plant response, task assignment and review across sites.

Set up Power Plant Operations your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appPower Plant Operations

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.