All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Production Dashboard
  2. Features
  3. Batch quality
Feature · Batch quality

Batch quality

Let the quality reviewer decide on the exact pending lot using completed production evidence and guarded release checks.

OverviewBatch release inbox
Production Dashboard · Batch quality

Batch release inbox

Approval conditions

New
NameLot numberWork orderProduced atExpiry dateDisposition
Ridge valve lot RV-2604L26-9931Vale pump housing, 240 units05 Nov09 NovPending
Vale housing lot VH-2611L26-1950Ridge actuator test, 180 units11 Nov13 NovPending
Haven filter lot HF-2620L26-1912Haven filter pack, 900 units27 Nov01 DecPending
Crest seal lot CS-2608L26-2533Ridge valve assembly, 600 units24 Nov29 NovPending
Ridge actuator lot RA-2613L26-0229Ridge valve assembly, 600 units13 Nov18 NovPending
6 of 6 records
Ridge valve lot RV-2604Batches · BTC-89209
Pending
Lot numberL26-9931
Work orderVale pump housing, 240 units
Produced at05 Nov
Expiry date09 Nov
Example screen with sample data

What you can do

Review the lot before accepting its output

Each batch identifies lot number, production date, expiry date and disposition against work order. Quality Reviewer uses the quality release action to approve an eligible Pending batch. The workflow checks the authenticated actor, exact batch identity, linked work order lifecycle and completed production interval before accepted output can be released.

The batch has a different purpose from the shift result. A shift result describes reported output against a target; a batch records a lot’s quality disposition. A favorable target comparison cannot authorize release. The reviewer must use the guarded decision on the exact evidence under review.

How the work is organized

The quality release action checks that good terminal output has not already been received and that a finished-goods stock balance exists for the batch lot. Quality Reviewer has read access to production records and exercises approval through the named action. The permission list does not grant raw editing of reviewer decisions or protected balances.

  • Pending decision. Begin with the exact batch whose disposition is Pending.
  • Evidence check. Follow work order to completed production intervals and validate the lifecycle and lot-specific inventory prerequisites.
  • Guarded approval. Quality Reviewer approves the submitted revision; repeated acceptance cannot create another good terminal receipt.

What to agree during setup

Define who can act as Quality Reviewer and which organizational scope they may inspect. Review exact submitted revisions and preserve the configured independence requirements. An operator’s ability to read batch context does not permit them to record the reviewer decision. Admin and Manager must preserve the reviewer’s decision authority when preparing access.

Prepare the finished-goods balance for the exact lot before the pilot decision. Agree the inspection evidence the reviewer needs before the first decision. The release action requires a completed production interval. Set up any additional customer inspection evidence with its source owner and rehearse how the reviewer checks it.

Check the handoff on an actual case

A work order has completed production evidence and a Pending batch. Quality Reviewer opens the batch, follows its work order and checks the relevant interval. They confirm the finished-goods balance for lot number and invoke the quality release action. The eligible decision moves disposition from Pending to Released through the guarded workflow.

Repeat the decision on the same terminal output and confirm the action cannot receive it again. Then rehearse a batch without completed production evidence and another whose finished-goods lot balance is missing. Both should remain unreleased after the failed action, with their prerequisite gaps available for resolution.

Test the action with a Production Operator account. Its read access cannot substitute for Quality Reviewer authority. Keep the batch unreleased when a prerequisite fails and record the issue for the planner to resolve. The review should explain which lot and evidence need attention before the next attempt.

What your team sees

Configure the review views with the appropriate decision owner:

  • Batch release inbox — Show Pending batch evidence to Quality Reviewer before approval.
  • Batch disposition board — Review recorded lot outcomes without giving every viewer decision rights.
  • Production interval history — Inspect the completed interval behind the release prerequisite.

Follow the work through

Batch evidence to release defines the decision rehearsal. Check roles for protected actions and reports for the distinction between output and released disposition.

What it keeps track of

Data model
Batches
Produced lots and their quality disposition.
Work orders
Production work orders released to the shop floor.
Production logs
Operator production intervals with good and scrap units.
Inventory balances
On-hand and reserved quantity by item, location and lot.
Items
Materials, components and finished goods.
People
Production staff and their linked platform user accounts.

Who uses it

Permissions
Quality Reviewer
Approves eligible output.
Production Planner
And Production Operator provide and inspect relevant context.
Production Operator
Captures assigned production work and evidence. Access restriction: Only assigned operational work. Native draft/evidence entry is limited to the listed tables; referenced setup and master records are readable solely as required labels and task context. Configuration, rates, commercial documents and approvals are never operator-editable. Quantity posting, signoff and state changes use the named guarded workflows with authenticated actor and source revision. Protected financial fields remain inaccessible.
Manager
Reviews business exceptions while the quality decision stays with Quality Reviewer.

Set up Production Dashboard your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appProduction Dashboard

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.