All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Textiles and Apparel QMS
  2. Features
  3. Audits and findings
Feature · Audits and findings

Audits and findings

Plan textile quality audits, assign requirement-linked findings and close after finding resolution.

OverviewOpen findings
Textiles and Apparel QMS · Audits and findings

Open findings

Audit findings

New
AuditRequirementFindingSeverityOwnerDue date
Sewing line quality auditShade within approved sampleShade cards lack second approvalObservationJonas Berg18 Nov
Cutting room process auditSeam strength at least 110 NNeedle log missing shift signoffMinorSofia Petrov25 Nov
Dyehouse chemical control auditCare label matches fiber contentTwo rolls have no test recordMajorMaya Desai21 Nov
Supplier fabric mill auditFabric width within 1 cm toleranceRejected pieces mixed with accepted stockObservationMaya Desai05 Nov
Cutting room process auditAll needles accounted forPacking check skipped on night shiftMinorAmara Okafor17 Nov
6 of 6 records
Shade within approved sampleAudit findings · AF-22643
Observation
AuditSewing line quality audit
FindingShade cards lack second approval
OwnerJonas Berg
Due date18 Nov
Example screen with sample data

What you can do

Keep audit scope and findings together

An audit records its number, scope, planned date, completion date, status and auditor. The status moves through Planned, in progress, Reporting and Closed. The auditor can use the scope to identify a supplier or internal textile quality review, then record each finding against its source requirement. Findings carry severity, due date, closure date and a named owner.

The audit workflow closes the audit only once every finding is closed. That rule keeps the audit’s completion decision tied to its detail. A Reporting audit with an open finding stays visible for follow-up. The owner can resolve the finding while the auditor checks whether the evidence addresses the named requirement.

How the work is organized

  • Plan. Auditor sets scope and planned date before fieldwork starts.
  • Record. Each finding names the requirement, observation, severity, owner and due date.
  • Close. Auditor confirms all findings are closed before closing the parent audit.

What to agree during setup

Agree the source of requirements used for supplier and internal audits. The requirement text on a finding should be recognizable to the owner and auditor, even when a separate document controls the detailed wording. Decide what counts as an Observation, Minor or Major finding and what proof is needed to set a closure date.

Assign auditors and finding owners before the first audit cycle. Make clear who checks closure evidence, especially when a finding owner also works in the audited area. The planned date should reflect the intended fieldwork, while the completion date records actual completion. Quality Manager can use the open audit and finding lists to keep overdue follow-up visible.

Check the handoff on an actual case

An Auditor plans a supplier textile quality audit, writes the scope and assigns the planned date. During fieldwork, they record a Major finding against the exact requirement, describe what was observed, set a due date and assign an owner. The audit advances to Reporting while the finding remains open.

The owner addresses the finding and the auditor checks the response against the requirement. The finding receives a closure date when resolved. If another finding remains open, the audit stays in Reporting. Only after every finding is closed does the auditor close the audit and record the completion date. The audit number provides a stable reference for later review.

What your team sees

  • Open audits — Planned, active and reporting work with the assigned auditor.
  • Open findings — Requirement-linked items still awaiting closure.

Follow the work through

What it keeps track of

Data model
Audits
Audits record for QMS for Textiles and Apparel.
Audit findings
Audit Findings record for QMS for Textiles and Apparel.
People
People records for QMS for Textiles and Apparel.

Who uses it

Permissions
Auditor
Plans and closes audits.
Quality Manager
Watches the follow-up queue.
Corrective Action Owner
May own a finding assigned to them.

Set up Textiles and Apparel QMS your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appQMS for Textiles and Apparel

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.