1. Quality Management System
  2. Features
  3. Nonconformance
Feature · Nonconformance

Nonconformance

A nonconformance report gives a quality issue its own record after a failed inspection or another stated source. It tracks affected material, severity, containment, cited defects and the final disposition. The Quality Manager decides the disposition; inspectors and supplier quality staff help assemble evidence.

OverviewNC rs Awaiting Disposition
Quality Management System · Nonconformance

NC rs Awaiting Disposition

Disposition approved waits for the quality manager

New
NCR numberAffected itemSeverityDispositionStatusDisposition approved by
NCR-60462PRD-7431CriticalAcceptAwaiting disposition
NCR-19518PRD-1587MajorReject returnAwaiting disposition
NCR-48835PRD-8576MinorScrapAwaiting disposition
NCR-20340PRD-7457CriticalUse as isAwaiting disposition
NCR-42672PRD-9564MajorRepair with deviationAwaiting disposition
6 of 6 records
PRD-7431Non conformance reports · NCR-60462
Critical
DispositionAccept
StatusAwaiting disposition
Example screen with sample data

What you can do

Keep the affected scope visible

The report links an affected item and may link its source inspection, supplier, lot and quantity. Affected serial records can narrow the scope further. A defect citation refers to a catalog code and quantity. When citations change, severity follows the worst cited defect: critical before major before minor. Root cause work is required for critical or major severity.

Containment records state the action applied, the affected scope, the application date and the person who applied it. The action may represent segregation, a shipping stop, recall, production hold or release with certificate only. Release date stays with the containment record so the team can distinguish an active hold from a concluded one. Agree who can release the action before starting live work.

The report moves through open, containment, awaiting disposition and approved disposition states. A pending disposition is not an approval. The Quality Manager records the selected disposition and the approving user and time. For a major or critical report, routing creates a corrective CAPA once, with its owner and Quality Manager. The linked CAPA carries the longer investigation and verification work.

How the work is organized

  • Issue record. The report keeps source, affected item, severity and current state together.
  • Immediate action. Containment records preserve what was held or released and when.
  • Decision trail. The approved disposition identifies the deciding person and time.

What to agree during setup

Choose who can set affected quantity and serial scope, who applies containment and who records release. Quality Manager should document the local meaning of accept, return, rework, scrap, use as is and repair with deviation decisions. Supplier Quality Engineer should be included when the affected material came from a supplier.

Check the handoff on an actual case

Start with a failed incoming inspection citing a major defect. Open its nonconformance report and confirm that the source inspection, item and severity are present. Record a segregation action against the lot. Add an affected serial and a defect citation. Review the revised severity, enter a disposition, then have Quality Manager approve it. Check that the major issue has one linked corrective CAPA, even after the report is edited again.

What your team sees

  • Open NC rs — Current issues by severity, source and state.
  • NC rs Awaiting Disposition — Decisions waiting for Quality Manager.
  • Active Containment — Applied actions without a release date.

Follow the work through

What it keeps track of

Data model
Non conformance reports
Non conformance report header driving containment, disposition and CAPA.
Containment
Containment actions applied to a non conformance report.
NCR defects
Defects cited on a non conformance report.
NCR affected serials
Serials affected by a non conformance report.
Defects
Defect catalog with severity and category cited by defect instances and NCR defects.
Inspections
Inspection event header with status and rolled-up pass/fail outcome.
CAP as
Corrective and preventive action header routed from major or critical issues.

Who uses it

Permissions
Quality Manager
Approves disposition.
Inspector / QC Operator
Records inspection evidence and issue detail.
Supplier Quality Engineer
Handles supplier-related containment and reports.

Set up Quality Management System your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started