These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
- Supply Chain
- Features
- Quality
Quality
Inspect against quality plans, record nonconformances with a disposition and run corrective and preventive actions to closure.
OverviewOpen Nonconformances×
Supply Chain · Quality
New
Open Nonconformances
Nonconformances
Minor2
PRD-5199VND-129
860
PRD-9908VND-066
450
Add
Major2
PRD-6487VND-147
800
PRD-7832VND-105
340
Add
Critical2
PRD-6105VND-076
810
PRD-5526VND-045
220
Add
What you can do
Catch bad material before it reaches stock or customers
Quality plans set the inspection rules: what they apply to (a product, a category, a supplier or everything), the sampling plan (100 percent, an AQL level or skip-lot) and the characteristics to check. Inspections record the type (incoming, in-process, final release or supplier audit), what was inspected, the lot, quantities inspected, accepted and rejected, the disposition, notes and the inspector.
Rejected or out-of-spec material becomes a nonconformance with a severity (minor, major or critical), defect code, quantity affected and disposition: rework, scrap, return to vendor, use as is or pending. Nonconformances move from Open through Under Review and Contained to Closed. Where a root cause needs fixing, a corrective or preventive action is raised with an action plan, due date, owner and effectiveness check, and moves from Open through In Progress and Verification Pending to Closed.
How the work is organized
- Plan-driven inspection. The plan decides the sampling, so inspection is consistent across receivers.
- Nonconformance for every reject. Rejected quantities are recorded with severity and disposition.
- CAPA to fix the cause. Repeated or serious issues get an owner, a plan and a check that the fix worked.
What to agree during setup
Agree quality plans for critical products and suppliers. Agree severity definitions and who may set Use As Is. Agree when a nonconformance needs a CAPA. Agree how supplier nonconformances feed vendor scorecards and tier reviews.
Check the handoff on an actual case
The 40 torn resin bags from lot R-2602 become a Major nonconformance with defect code PKG-TEAR and disposition Return to Vendor. The Quality Manager contains it by moving the bags to quarantine. It is the third packaging nonconformance from this supplier in a quarter, so she raises a corrective action owned by the buyer: the supplier must switch to reinforced bags by April 30.
The supplier confirms the change. In May, three deliveries arrive without torn bags; the effectiveness check is recorded and the action is Closed. The supplier’s quality acceptance on the next scorecard reflects the improvement.
What your team sees
- Open Nonconformances — Open, under-review and contained nonconformances with severity, quantity and disposition.
- Open CAP as — Corrective and preventive actions in progress with owner and source nonconformance.
- Receipts Pending QC — Deliveries waiting for incoming inspection.
Follow the work through
- Purchase order to goods receipt: Incoming inspection on receipt.
Review roles before assigning CAPA owners.
What it keeps track of
Data model- Quality plans
- Inspection rule templates per product, category or supplier.
- Quality inspections
- Quality inspections on inbound, in-process and outbound material.
- Nonconformances
- Formal records of rejected or out-of-spec material.
- CAP as
- Corrective and preventive action records.
- Contacts
- Supplier and customer master records. Type distinguishes vendors from customers.
Who uses it
Permissions- Quality Manager
- Owns plans, inspections, nonconformances and CAP as.
- Procurement Manager
- Reads supplier nonconformances.
- Buyer
- Owns supplier-facing actions.
- Admin
- Manages access.
Set up Supply Chain your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.