Feature · Yard visits and detention

Yard visits and detention

Record trailer location and visit times, then review the evidence for detention and closure.

OverviewTrailer visits awaiting approval
Trailer Tracking System · Yard visits and detention

Trailer visits awaiting approval

Approval conditions

New
Visit numberTrailer assetYardTrailer locationArrival timestampDeparture timestamp
TV-82181VHC-30310YRD-768L-14AT-356DT-125
TV-35414VHC-67315YRD-779Z-6AT-582DT-527
TV-64997VHC-19335YRD-722G-9AT-209DT-669
TV-28002VHC-72787YRD-556E-24AT-443DT-305
TV-36029VHC-85166YRD-449G-12AT-303DT-583
6 of 6 records
YRD-768Trailer visits · TV-82181
Submitted
Trailer assetVHC-30310
Trailer locationL-14
Arrival timestampAT-356
Departure timestampDT-125
Grace minutes110
Example screen with sample data

What you can do

Give each yard stay an accountable close

A trailer may arrive during one shift and leave during another. The visit brings its asset identity, load and yard location together so the team can explain what happened during that stay. Yard Operator gathers arrival evidence during the stay, then saves the visit after departure with both actual timestamps and the agreed grace period. Yard Supervisor reviews the submitted visit before authorizing closure.

Detention review needs the actual instants of arrival and departure. Keep the time zone offset with each timestamp, especially when a partner supplies times from another region. The closure calculation uses whole elapsed minutes, subtracts the grace period and floors the result at zero. The resulting duration supports a commercial discussion; Finance Reviewer separately reviews any charge against the load.

How the work is organized

  • Capture the stay. Identify the registered trailer and linked load on the arrival paperwork. After departure, save the yard visit with both actual timestamps and the observed trailer location. Keep its visit number with that evidence for review.
  • Review the submitted case. Yard Supervisor checks the identified trailer, chronological times and grace period before marking the visit Approved or Rejected. Keep the decision reason with the source visit and its revision.
  • Reconcile the close. Check the operation receipt and calculated detention against the reviewed visit. A closure request already supported by a receipt needs reconciliation before another attempt. Keep a close note that explains any operational exception.

What to agree during setup

Configure and test the approval and closure actions with Yard Supervisor during setup. Agree who supplies the grace period and who decides whether the visit evidence is ready for approval. Rehearse the closure action with an arrival after midnight, a departure carrying a different offset and a repeat request. Define the handoff for rejected visits so the Yard Operator knows which observation needs correction.

Treat the yard name and trailer location as working descriptions the next shift can use. Decide which observed parking position belongs on the visit and how staff check the final departure. Explain any relevant position change in the close note. Before release, ask the Yard Supervisor to reconcile the saved result with the approved evidence rather than relying on a completed label alone.

Check the handoff on an actual case

Trailer T-204 arrives at 09:00 and departs at 11:15 in the same time zone. Its agreed grace period is 60 minutes. Yard Operator submits the visit with the linked trailer and load. Yard Supervisor checks the source times and approves the case. The expected detention is 75 minutes.

Now repeat the closure request. The team should find the existing receipt and investigate any inconsistency before proceeding. Next, rehearse a departure earlier than arrival: the case needs correction before closure. Finally, ask Finance Reviewer to locate the completed visit from the load and explain the duration supporting a detention charge.

What your team sees

  • Trailer visits awaiting approval — Submitted visits with the times and grace period needed for a decision.
  • Trailer visit board — Visit work grouped by its current operating status.
  • Completed trailer visits — Closed visits with recorded detention and closure notes.

Follow the work through

Follow trailer arrival to closure, then use charges and exception review for the commercial handoff.

What it keeps track of

Data model
Trailer visits
Trailer site visits linked to registered trailer assets and loads, capturing yard and trailer location, arrival and departure timestamps, grace periods, detention, and closure evidence.
Vehicles
Powered units and trailing equipment in the fleet
Loads
Planned and executed transport loads
Review decisions
Approval, rejection and escalation decisions on records
Operation receipts
Recorded operational outcomes awaiting verification
Record attachments
Documents, photos and signature evidence attached to records

Who uses it

Permissions
Yard Supervisor
, Yard Operator, Evidence Reviewer, Finance Reviewer.
Yard Supervisor
Decides visit approval; Evidence Reviewer helps reconcile closure evidence.

Set up Trailer Tracking System your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started