Turbine performance

Production intervals with wind speed and availability.

OverviewTurbine production intervals
Wind Farm Management · Turbine performance

Turbine production intervals

Turbine intervals

New
IdTurbineStarts atEnds atEnergy kWhWind speed MPS
EVT-2026-4101Prairie Lantern turbine 0815 Nov19 Nov660760
TASK-2026-2204Stone Creek turbine 0613 Nov17 Nov90550
SITE-031Prairie Lantern turbine 0809 Nov12 Nov230250
INT-20261015-08Cedar Mesa turbine 0206 Nov09 Nov910820
TINT-20261015-09Cedar Mesa turbine 0217 Nov20 Nov520650
6 of 6 records
EVT-2026-4101Turbine intervals · TI-96894
TurbinePrairie Lantern turbine 08
Starts at15 Nov
Ends at19 Nov
Energy kWh660
Wind speed MPS760
Example screen with sample data

What you can do

See what each turbine produced, and why

Turbine production intervals record, for each turbine and period, the energy produced in kilowatt-hours, the wind speed in metres per second and the minutes the turbine was available. Put together, they answer the question owners ask most: when the wind was there, was the turbine there too? A turbine with high wind speed and low energy over the same interval has a problem. A turbine with low wind speed and low energy had a quiet day.

Intervals are recorded by the operations engineer and submitted as evidence to the performance reviewer. The original interval is kept. A correction is added as later evidence linked to the same turbine, not written over the first figure, so the record shows both what was first reported and what was corrected, and when.

How the work is organized

Production is recorded per turbine and per period, and reviewed before it is used in performance reporting.

  • Attributed records. Each interval is recorded by a named person through their linked user account, so a question about a figure goes to the person who entered it.
  • Corrections add, never overwrite. A wrong interval is corrected with new evidence; the original stays.
  • Availability next to energy. Available minutes sit beside energy and wind speed, so lost production can be split into “not available” and “available but not producing”.

What to agree during setup

Agree the interval length you report on, and whether intervals come from the turbine controller system or are entered from shift reports. Agree who reviews production evidence and how quickly. Decide how availability is counted for a curtailed turbine, since it is available but held back. Prepare examples of a normal interval, an interval during a curtailment, an interval with a wind speed sensor fault and a corrected interval.

Check the handoff on an actual case

During a windy afternoon one turbine shows normal wind speed but only half the energy of its neighbours. The operations engineer records the intervals as reported and logs an alarm event on the site. The performance reviewer sees the low energy against the wind speed and the open event in the same period, and holds the intervals for follow-up instead of approving them into the monthly figures.

The technician later finds a pitch fault. Corrected availability is added as later evidence for those intervals, and the review outcome is recorded. The monthly availability report shows the reduced available minutes for that turbine and that day, with the event that explains it.

What your team sees

  • Turbine production intervals — Energy, wind speed and available minutes per turbine and period.
  • Turbine status board — Current operating state for every turbine.

Follow the work through

See the reports built on production intervals.

What it keeps track of

Data model
Turbine intervals
Per-turbine production intervals with wind speed and availability.
Turbines
Individual wind turbines with rated capacity and operating state.

Who uses it

Permissions
Operations Engineer
Records turbine state and production and runs operational events from logging to resolution.
Performance Reviewer
The operations engineer records production the performance reviewer reviews it.

Set up Wind Farm Management your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appWind Farm Management

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.