These cookies are required for the website to function properly. They ensure security, enable basic features like page navigation, and store user session data. You cannot disable these cookies.
- 3D Printing Job Manager
- Features
- Materials
Materials
Trace material issues to the work order and lot, with a single stock effect for posting or reversal.
OverviewMaterial issue inbox×
3D Printing Job Manager · Materials
New
Material issue inbox
Approval waits for the production planner
| Id | Work order | Item | Lot number | Quantity | Issued at | |
|---|---|---|---|---|---|---|
| IDD-356 | WO-9958 | ITM-5625 | L26-2730 | 580 | 02 Oct | |
| IDD-579 | WO-7030 | ITM-8812 | L26-9634 | 630 | 11 Oct | |
| IDD-572 | WO-5869 | ITM-8055 | L26-9309 | 740 | 03 Oct | |
| IDD-652 | WO-9685 | ITM-6533 | L26-0992 | 700 | 08 Oct | |
| IDD-615 | WO-2587 | ITM-1016 | L26-5299 | 200 | 11 Oct |
6 of 6 records
IDD-356Material issues · MI-49472
DraftWork orderWO-9958
ItemITM-5625
Lot numberL26-2730
Quantity580
Issued at02 Oct
What you can do
Make material use explainable
Material control starts with an item and its unit. Inventory balances show on-hand and reserved quantities by item, location and lot. An issue records which material lot was used for a work order, how much was issued and when. The Production Operator can follow that issue back to the job that consumed it.
A Draft issue has not yet completed posting. The material workflow posts the issue against matching item-and-lot inventory and reduces on-hand stock once. A reversal restores the posted quantity once. Keep the issue record available after a correction so the planner can distinguish active consumption from a reversed posting.
How the work is organized
- Item setup. Use material items with an agreed unit and recognizable item code. Keep the active setting current. Compare the material selected for a print build with the item used on its issue before submitting the posting.
- Lot selection. Check the physical lot against the balance and issue record. The work-order link explains which production job receives the material. The quantity should use the item’s agreed unit throughout the posting.
- Posting and correction. Submit the Draft issue through the material workflow. Confirm that it becomes Posted and that stock changes once. If the posting must be undone, reverse it through the same controlled process and check the restored balance.
What to agree during setup
Agree how material lots are named and which storage locations appear in opening balances. Reconcile those balances with the material physically present before the first live issue. Set a clear procedure for choosing the correct balance when the same item and lot appear in more than one storage location.
Choose who requests reversals and how the operator explains the correction to the planner. Test the workflow with the shop’s unit conventions, including fractional material quantities. Keep material posting separate from recording production output: the material action owns the stock change, and the operator interval owns the good and scrap evidence.
Check the handoff on an actual case
A work order needs 0.8 kilograms from a material lot whose on-hand balance is 5 kilograms. The operator checks the item unit and physical lot, creates the issue and submits it for posting. The balance becomes 4.2 kilograms. Replaying that same posting should leave the balance at 4.2 kilograms.
Now reverse the posted issue as a rehearsal of a correction. The balance returns to 5 kilograms, and repeating the reversal must leave it there. Open the issue alongside its work order so a second operator can explain why stock was restored. Before moving to live use, repeat the case using the shop’s actual item and lot names and confirm that the selected balance is unambiguous.
What your team sees
- Material issue inbox — Draft material issues waiting for their item, lot, quantity and work order to be checked.
- Posted material issues — Posted consumption with the stock-applied indicator available for reconciliation.
Follow the work through
Rehearse material posting and reversal. Follow replenishment work in supplier purchasing.
What it keeps track of
Data model- Items
- Materials, components and finished goods
- Inventory balances
- On-hand and reserved quantities by item, location and lot
- Material issues
- Material postings against a work order
- Work orders
- Released production work for an order
- Print builds
- Print jobs on a printer with material and layer settings
Who uses it
Permissions- Production Operator
- , Production Planner, Quality Reviewer.
- Operators post and reverse issues, planners reconcile material use, and reviewers inspect consumption evidence alongside production results.
Set up 3D Printing Job Manager your way.
Start free, then use Proto to change fields, steps and approvals before your team goes live.