All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. 3D Printing Job Manager
  2. Features
  3. Print builds
Feature · Print builds

Print builds

Keep the model file, printer, material and build state together throughout the print run.

OverviewPrint queue
3D Printing Job Manager · Print builds

Print queue

Printing waits for the production operator

New
IdPrinterMaterialModel fileLayer height MMEstimated hours
WO-2026-0412Printer Bay D, carbon nylonAluminum-filled fixture spacersensor_housing_rev_c.stl508
ORD-2026-0187Dimensional inspection benchClear resin inspection windowhinge_bracket_40mm.step2906
PB-2026-0294Printer Bay B, nylonNylon hinge bracket, 40 mmenclosure_lid_vented.stl8908
BATCH-2026-0088Printer Bay D, carbon nylonNylon hinge bracket, 40 mmcable_guide_120mm.3mf2201
MI-2026-0143UV cure cabinet 2Resin display housing, matte whitedrone_mount_rev_b.step3407
6 of 6 records
WO-2026-0412Print builds · PB-98085
Queued
PrinterPrinter Bay D, carbon nylon
MaterialAluminum-filled fixture spacer
Model filesensor_housing_rev_c.stl
Layer height MM50
Estimated hours8
Example screen with sample data

What you can do

Keep each printer run recognizable

The print build is the operator’s record of the job on a printer. It holds the model attachment, layer height in millimeters and estimated hours, together with the printer and material. Link it to the work order when the run is part of a customer production job so finishing staff can follow the same work forward.

Start the build at Queued. The operator records Printing while the machine is running, Cooling after the print, and post-processing when finishing work begins. An inspected build can be marked Inspected; a failed run can be marked Failed. Use those states to explain where the physical parts are and what action the next person needs to take.

How the work is organized

  • Build preparation. Attach the model file and check the material and layer height before starting. Compare the selected printer with the work-order resource. Resolve a disagreement before the operator commits material to the run.
  • Queue ownership. Keep estimated hours visible alongside the printer. The Production Planner uses the queue to discuss the next job with the Production Operator. The operator updates the build state when the physical work changes.
  • Finishing handoff. Assign support removal, washing, curing or sanding against the build that produced the parts. Keep the build identifiable even when several jobs use the same material and printer during a shift.

What to agree during setup

Agree a model-file naming convention that lets an operator recognize the intended part and revision. Decide who checks layer height and material before starting a queued build. Slicing and sending machine instructions are connections or operating procedures to arrange with the shop’s existing tools.

Define what the team means by Cooling and when it is safe to hand parts to finishing. Agree the inspection evidence the operator needs before changing a build to Inspected. For the pilot, give each run its own work order and link the build and produced lot to that job. Record its production intervals there so the reviewer can compare output without mixing repeat attempts. Keep a failed build available when planning its replacement.

Check the handoff on an actual case

A clip build is queued on Printer B with its model attachment, material and estimated run time. The operator checks the linked work order, starts the job and records Printing. After the machine finishes, the operator records Cooling while the parts remain at the printer.

The finishing operator takes responsibility when the build moves to post-processing. They open the assigned support-removal step against the same build and record the result when complete. If a separate run fails before cooling, keep that build marked Failed and record its output against its own work order. During the rehearsal, ask the next operator to find the correct model and finishing work using the build record alone. Any ambiguity should be resolved in the naming and handoff rules before go-live.

What your team sees

  • Print queue — Queued builds with the chosen printer, material, model attachment and estimated hours.
  • Build progress board — Builds grouped from Queued through Inspected, with Failed work visible for follow-up.

Follow the work through

Follow printing, finishing and review and use material posting and reversal when preparing the run.

What it keeps track of

Data model
Print builds
Print jobs on a printer with material and layer settings
Resources
Printers and production resources
Items
Materials, components and finished goods
Work orders
Released production work for an order
Post process steps
Support removal, washing, curing and sanding steps

Who uses it

Permissions
Production Operator
Captures assigned production work and evidence.
Production Planner
Owns production setup, planning and assigned operational work.
Quality Reviewer
Operators maintain build evidence, planners coordinate the queue, and reviewers inspect the linked work before the lot decision.

Set up 3D Printing Job Manager your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected app3D Printing Job Manager

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.