All applications583

Find your application

583 applications

Open full catalog

Browse applications by category or open the full catalog.

  1. Batch Manufacturing
  2. Features
  3. Production logs
Feature · Production logs

Production logs

Record the operator interval and compare good and scrap units before the quality handoff.

OverviewProduction Intervals
Batch Manufacturing · Production logs

Production Intervals

Production logs

New
IdWork orderOperatorStarted atEnded atGood units
WO-2026-1048Lavender soap rework, October 21Tomas Ibarra12 Nov15 Nov20
LOT-2026-0821Holiday assortment fill runElena Petrov15 Nov17 Nov100
MAT-2026-0414Unscented lotion run, October 18Nia Okafor08 Nov11 Nov100
PO-2026-0318Lavender soap rework, October 21Sofia Mendes06 Nov13 Nov90
LOG-2026-1016Lavender soap run, October 17Elena Petrov14 Nov19 Nov20
6 of 6 records
WO-2026-1048Production logs · PL-20487
Work orderLavender soap rework, October 21
OperatorTomas Ibarra
Started at12 Nov
Ended at15 Nov
Good units20
Example screen with sample data

What you can do

Explain what happened during the run

Operator ends a production interval with the work order, operator identity, start and end times and the quantities of good and scrap units. That interval connects the floor’s account of the run to the work awaiting quality review. Planner can inspect progress against planned production, while Quality Reviewer can examine the recorded output before deciding which batch output can enter finished inventory.

Production Logs and Details provides work order and operator filters. Its daily Recorded entries trend groups entries by creation date. Selecting a log reveals material issues and inventory balances for closer investigation. Use the selected work context when discussing a result so another run’s quantities do not become part of the explanation.

How the work is organized

  • Capture the interval. Operator records the actual start and end and the good and scrap units. The interval capture checks the submitted time boundaries before saving the record.
  • Read the yield basis. Production yield uses good units divided by good plus scrap units. Keep the numerator and denominator visible when comparing runs, and leave a zero-denominator result without a percentage.
  • Hand over for inspection. Saving the production interval routes the work order to quality review. Quality Reviewer then examines the batch’s input and output evidence before approving accepted output.

What to agree during setup

Agree the unit used for production quantities and the time zone used to record intervals. Map each Operator to the correct person and user identity. Shared names must not cause another person’s work to appear in the operator’s personal list. Rehearse filters with ordinary accounts before opening the pilot to the floor.

Define how the team distinguishes entry date from the production interval itself. A log entered the following morning belongs to that morning’s entry trend, while its start and end still describe the earlier production work. Review the denominator used in yield discussions. A batch output quantity and a production log quantity serve different reviews and should retain their own context.

Check the handoff on an actual case

Operator records a run from 09:00 to 10:00 with 96 good units and 4 scrap units. Production yield is 96 divided by 100, or 96 percent. Quality Reviewer can see the actual good and scrap quantities behind that result. The work order moves to quality review while the finished inventory receipt waits for the accepted-output decision.

During rehearsal, select that log and inspect its related material issues. Confirm that the quantities describe the same work order. Then switch to a different operator filter and check that the results change as expected. Ask Planner to find the interval by its production date and explain why a later entry might appear on a different day in the entry trend.

Test an end time before the start and check that the interval capture prevents it. Also examine a zero-output interval: it must not be presented as a perfect yield. These cases let the floor and quality team agree what needs correcting before they rely on a chart during their daily review.

What your team sees

  • Production Intervals — Review recorded start and end times with the work order, operator and production quantities.
  • My Production Logs — Inspect the signed-in operator’s intervals before a handoff or quantity discussion.

Follow the work through

Use Interval to quality review for the floor handoff and Output quantities to review to interpret batch totals. Reports explains the yield basis.

What it keeps track of

Data model
Production logs
Production interval logs with good and scrap units
Work orders
Production work orders
People
People records for Batch Manufacturing
Users
Sign-in accounts for the people who use the app.
Material issues
Material issue postings to work orders
Inventory balances
Item inventory balances by location and lot

Who uses it

Permissions
Operator
Records the run.
Planner
Reviews progress, Quality Reviewer checks the production evidence, and Admin maintains the person-to-user mapping.
Quality Reviewer
Creates batch identities, inspects batch evidence, maintains disposition and approves accepted output for inventory receipt.
Admin
Maintains identities and reference data and configures the team’s access.

Set up Batch Manufacturing your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started

A personal agent for your business

Get started with Proto

Your app is selected. Download Proto, then open it with this context.

Selected appBatch Manufacturing

Choose your computer’s platform.

Download Proto

Install Proto, then return to this panel.

Already installed? Open Proto

Free to use. Your own model provider may charge for usage.