1. Bug Tracking System
  2. Features
  3. Defect Intake and Triage
Feature · Defect Intake and Triage

Defect Intake and Triage

Record the reported behavior, assess severity and put each defect into an owned project queue.

OverviewFixed Defects Awaiting Verification
Bug Tracking System · Defect Intake and Triage

Fixed Defects Awaiting Verification

Verified waits for the qa engineer

New
Issue keyDefect summarySeverityProjectOwnerReported by
IK-710DS-774CriticalPRJ-3897
IK-759DS-813HighPRJ-5560
IK-870DS-100MediumPRJ-4503
IK-654DS-309LowPRJ-6000
IK-177DS-458CriticalPRJ-5541
6 of 6 records
IK-710Defect reports · DR-46053
Critical
Defect summaryDS-774
ProjectPRJ-3897
Reporter notesFixed dr-687
StatusFixed
Example screen with sample data

What you can do

Give the next person enough to investigate

A useful defect report explains what happened and where the team should look. Record the summary, project and reporter notes, then identify the reporter and corrective owner. The issue key gives the team a stable reference for discussion. The reported date helps a QA Engineer distinguish a new report from an older problem still waiting for attention.

Severity describes the seriousness of the defect. Critical, High, Medium and Low give the team a common vocabulary for triage. Task priority is a separate planning choice made when corrective work is assigned. A serious defect may require investigation before the Project Manager can decide exactly which task should move first.

How the work is organized

  • Report context. Write the observed behavior and the conditions needed to repeat it in the reporter notes. Identify the project before routing the report. Give the summary enough detail that an owner can recognize the problem without opening every attachment in the queue.
  • Severity assessment. QA Engineer checks the report and selects the severity used by the team. The triage action requires an existing report marked Open with severity present. A report that no longer meets those conditions produces a failed-attempt receipt for investigation.
  • Corrective ownership. QA Engineer assigns the person responsible for investigating the defect and retains the reporter separately. After successful triage, the report becomes Triaged. Project Manager can then organize the corrective task within the project’s work package and record the issue key in its description.

What to agree during setup

Agree what each severity means for your product and which examples help a reporter choose consistently. A customer-facing failure and an internal display defect may need different responses, but the team should be able to explain the assigned severity. Decide who corrects incomplete reports before the triage action runs.

Set a reporting convention for reproduction steps and expected behavior. Agree the identifier used when a task refers to a defect, and keep the issue key visible in that description. Decide who reviews failed triage receipts so an incomplete report does not disappear behind an apparently quiet queue. Explain the difference between reporting a problem and accepting its eventual fix during the first team rehearsal.

Check the handoff on an actual case

Use an illustrative checkout project where a discount is displayed incorrectly. The QA Engineer records what the tester entered, the displayed result and the expected behavior. The report belongs to the checkout project, carries a severity and starts as Open. The triage action moves it to Triaged and records the successful operation.

Repeat with severity omitted. The report should remain untriaged and the failed attempt should explain why. Then retry the report that already reached Triaged; it no longer meets the Open-state guard. Finally, have the Project Manager create a corrective task, include the issue key in its description and assign a Developer. The Developer should be able to identify the original report without guessing from similar task titles.

What your team sees

  • Open Defect Reports — Reported defects grouped by their working state, with severity and ownership visible.
  • Failed Operations — Unsuccessful triage attempts with the source reference and explanation needed for correction.

Follow the work through

Continue through report and triage, then fix and verification once corrective work is assigned.

What it keeps track of

Data model
Defect reports
Defects raised against project work, tracked from Open through triage, fix and independent verification.
Projects
Engagements delivered for an organization, with budget and schedule.
Team members
Delivery staff with role, practice and weekly capacity.
Tasks
Individual pieces of work assigned to a delivery team member.
Operation receipts
Evidence that a delivery operation was executed.

Who uses it

Permissions
QA Engineer
Assesses reports and severity.
Developer
Investigates assigned defects.
Project Manager
Organizes corrective work.
Delivery Lead
Reviews the project-level position.

Set up Bug Tracking System your way.

Start free, then use Proto to change fields, steps and approvals before your team goes live.

How to get started